MEASURED PRICE CONSTRUCTION CONTRACT<br />

General Conditions<br />

Operational excellence for results that matter<br />

(vii)<br />

(viii)<br />

(ix)<br />

(x)<br />

safety statistics, including details <strong>of</strong> any hazardous incidents and<br />

activities relating to environmental aspects and public relations;<br />

details and duration <strong>of</strong> adverse weather conditions;<br />

a revised working programme and comparisons <strong>of</strong> actual and planned<br />

progress, in accordance with Sub-Clause 8.3 [Contract Programme],<br />

with details <strong>of</strong> any events or circumstances which may jeopardise the<br />

completion in accordance with the Contract and the Contract<br />

Programme, and the measures being (or to be) adopted to overcome<br />

or mitigate any delays; and<br />

any other matters as may be set out in the Contract or other<br />

information reasonably required by the Employer or the Employer's<br />

Representative from time to time.<br />

(e)<br />

If the Contractor fails to submit a monthly progress report in accordance with<br />

this Sub-Clause 4.21, the Employer may, in its absolute discretion, withhold<br />

payments due to the Contractor until such monthly progress report has been<br />

submitted.<br />

4.22 Security <strong>of</strong> the Site<br />

Security <strong>of</strong> the Site<br />

Unless otherwise stated in the Contract:<br />

(a)<br />

(b)<br />

the Contractor shall be responsible for keeping unauthorised persons <strong>of</strong>f the<br />

Site. Authorised persons shall be limited to the Contractor's Personnel and<br />

the Employer's Personnel and any other personnel notified to the Contractor,<br />

by the Employer or the Employer's Representative, as authorised personnel<br />

<strong>of</strong> the Employer or the Employer's other contractors on the Site; and<br />

the security and safety <strong>of</strong> the Site, the Contractor’s Equipment, the<br />

Employer’s Equipment, Plant, Materials and all other property or personnel on<br />

the Site is the sole responsibility <strong>of</strong> the Contractor.<br />

4.23 Contractor's Operations on Site<br />

Contractor's Operations on Site<br />

(a)<br />

(b)<br />

The Contractor shall confine its operations to the Site, and to any additional<br />

areas which are directly required by the Contractor to execute the Works and<br />

which are agreed by the Employer's Representative as working areas. The<br />

Contractor shall take all necessary precautions to keep the Contractor's<br />

Equipment and the Contractor's Personnel within the Site and those<br />

additional areas, and to keep them <strong>of</strong>f adjacent land.<br />

The Contractor shall not use any part <strong>of</strong> the Site for any purpose not<br />

connected with the execution <strong>of</strong> the Works without the prior written approval<br />

<strong>of</strong> the Employer. The Contractor shall not destroy, damage or pull down any<br />

tree, hedge, wall or building outside the area occupied by the Permanent<br />

© UNOPS 2011 46