STREET<br />

Annual Concrete Street Rehabilitation <strong>Program</strong><br />

COSTS ITEMIZED U nprogrammed<br />

(In 000's) TOTALS 2010 2011 2012 2013 2014 2015+<br />

Design -<br />

Acquisition -<br />

Construction 7,379.3 723.1 748.4 445.6 801.7 276.5 4,384.0<br />

TOTAL 7,379.3 - 723.1 748.4 445.6 801.7 276.5 4,384.0<br />

FUNDING SOURCES<br />

GOB 4,653.9 482.1 498.9 187.4 534.5 - 2,951.0<br />

Road Use 2,725.4 241.0 249.5 258.2 267.2 276.5 1,433.0<br />

-<br />

TOTAL 7,379.3 - 723.1 748.4 445.6 801.7 276.5 4,384.0<br />

AA<br />

PROJECT CLASSIFICATION<br />

Imminent Need or Emergency:<br />

Special Opportunity<br />

X A Existing Need: Plans and<br />

Approval Complete<br />

B<br />

C<br />

D<br />

E<br />

Existing or Developing Need:<br />

Minor Plan Approvals Needed<br />

Plans Under Preparation: Need<br />

Acquistion, Assessment, or<br />

3rd Party Approvals<br />

Growing Demand: No plans,<br />

need further study or lengthy<br />

approval process<br />

Future need as growth<br />

continues; other projects<br />

completed, or funding obtained<br />

PROJECT STATUS Completed In Year Future<br />

Studies/Need Asses. X<br />

Survey/Prel. Design X<br />

Acquisitions<br />

Assessment Schedule 10-14 X<br />

Plans<br />

State/Federal Approval<br />

Bid/Construction 10-14 X<br />

Other<br />

Description: Proposed is an annual street<br />

rehabilitation program to provide full depth<br />

concrete patching at locations identified in the<br />

2009 Pavement Management Report. The report<br />

serves as the foundation to identify annual and<br />

future street rehabilitation projects.<br />

Justification: This annual rehabilitation program<br />

will delay total reconstruction and decrease long<br />

term maintenance costs. The projects will<br />

supplement the Public Works activities to improve<br />

the pavement ratings set out in the Pavement<br />

Management Report.<br />

Project Status:. This will be an ongoing program<br />

that is bid out annually. The 2012 project is<br />

separately scheduled in this <strong>CIP</strong> as the “Douglas<br />

Avenue Preservation Project – 100 th Street to<br />

111 th Street”. The 2014 project is separately<br />

scheduled in this <strong>CIP</strong> as the “Aurora Avenue<br />

Preservation Project: 70 th Street to 86 th Street”.<br />

Effect on Operating Budget: The annual Road<br />

Use fund allocation in the operating budget will<br />

decrease significantly from prior years.<br />