STREET<br />

Aurora Avenue: 128 th Street to 142 nd Street<br />

COSTS ITEMIZED U nprogrammed<br />

(In 000's) TOTALS 2010 2011 2012 2013 2014 2015+<br />

Design 452.5 131.7 320.8<br />

Acquisition 150.0 150.0<br />

Construction 3,016.1 877.7 2,138.4<br />

TOTAL 3,618.6 - 1,009.4 - - - - 2,609.2<br />

FUNDING SOURCES<br />

GOB 2,870.7 # 837.5 2,033.2<br />

Spec Assmt 747.9 171.9 576.0<br />

-<br />

Sub-Total 3,618.6 - 1,009.4 - - - - 2,609.2<br />

Less Prior Debt Issued in 2009 (705.0)<br />

GOB remaining balance to issue 132.5<br />

Spec Assmt 171.9<br />

TOTAL 2,913.6 304.4 2,609.2<br />

AA<br />

A<br />

B<br />

PROJECT CLASSIFICATION<br />

Imminent Need or Emergency:<br />

Special Opportunity<br />

Existing Need: Plans and<br />

Approval Complete<br />

Existing or Developing Need:<br />

Minor Plan Approvals Needed<br />

X C Plans Under Preparation: Need<br />

Acquistion, Assessment, or<br />

D<br />

E<br />

3rd Party Approvals<br />

Growing Demand: No plans,<br />

need further study or lengthy<br />

approval process<br />

Future need as growth<br />

continues; other projects<br />

completed, or funding obtained<br />

Description: Proposed is the paving <strong>of</strong> Aurora<br />

Avenue from 128 th Street to 142 nd Street.<br />

Justification: This project is a rural cross section<br />

road that is in need <strong>of</strong> reconstruction due to its<br />

traffic volume.<br />

Project Status: The project is in the development<br />

stage. Phase I – 2010: would pave a quarter mile<br />

along the frontage <strong>of</strong> the Webster Elementary School<br />

and Jeff Harm Park. Phase II – 2015+: would start<br />

one quarter mile west <strong>of</strong> 128 th Street and extend to<br />

142 nd Street in 2015+. Approximately one-half <strong>of</strong><br />

this Phase II is in the <strong>City</strong> <strong>of</strong> Grimes.<br />

Effect on Operating Budget: Minimal effect,<br />

estimated at $1,000 annually for maintenance.<br />

PROJECT STATUS<br />

Completed<br />

In Year<br />

Future<br />

Studies/Need Asses. 07<br />

Survey/ Prel. Design 09<br />

Acquisition 09<br />

Assessment Schedule 10<br />

Plans 09<br />

State/Federal Approval<br />

Bid/Construction 10 X<br />

Other<br />

76