Capital Improvements Program (CIP) Document - City of Urbandale
Capital Improvements Program (CIP) Document - City of Urbandale
Capital Improvements Program (CIP) Document - City of Urbandale
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
TRAFFIC SIGNAL<br />
128 th Street and Plum Drive<br />
COSTS ITEMIZED U nprogrammed<br />
(In 000's) TOTALS 2010 2011 2012 2013 2014 2015+<br />
Design 15.0 15.0<br />
Acquisition -<br />
Construction 120.0 120.0<br />
TOTAL 135.0 - - - - - 135.0 -<br />
FUNDING SOURCES<br />
Private 135.0 135.0<br />
-<br />
-<br />
TOTAL 135.0 - - - - - 135.0 -<br />
AA<br />
PROJECT CLASSIFICATION<br />
Imminent Need or Emergency:<br />
Special Opportunity<br />
Description: Proposed is the installation <strong>of</strong> a<br />
traffic signal at the intersection <strong>of</strong> 128 th Street and<br />
Plum Drive.<br />
A<br />
B<br />
Existing Need: Plans and<br />
Approval Complete<br />
Existing or Developing Need:<br />
Minor Plan Approvals Needed<br />
Justification: As traffic volumes increase, a<br />
traffic signal will be needed at this intersection.<br />
Project Status: Plans are in the conceptual stage.<br />
C<br />
Plans Under Preparation: Need<br />
Acquistion, Assessment, or<br />
3rd Party Approvals<br />
X D Growing Demand: No plans,<br />
need further study or lengthy<br />
approval process<br />
Effect on Operating Budget: Increase<br />
approximately $250 for traffic signal maintenance<br />
and $300 for electrical service.<br />
E<br />
Future need as growth<br />
continues; other projects<br />
completed, or funding obtained<br />
PROJECT STATUS<br />
Completed<br />
In Year<br />
Studies/Need Asses. 06<br />
Survey/ Prel. Design 12<br />
Acquisition<br />
Assessment Schedule<br />
Plans 12<br />
State/Federal Approval<br />
Bid/Construction 14<br />
Other<br />
Future<br />
132