STREET<br />

100 th Street Interchange<br />

COSTS ITEMIZED U nprogrammed<br />

(In 000's) TOTALS 2010 2011 2012 2013 2014 2015+<br />

Design 3,650.0 3,650.0<br />

Acquisition 2,000.0 2,000.0<br />

Construction 15,850.0 15,850.0<br />

TOTAL 21,500.0 - - - - - - 21,500.0<br />

FUNDING SOURCES<br />

TIF 2,425.0 2,425.0<br />

Federal 4,850.0 4,850.0<br />

County 4,225.0 4,225.0<br />

IDOT 10,000.0 10,000.0<br />

TOTAL 21,500.0 - - - - - - 21,500.0<br />

AA<br />

A<br />

B<br />

C<br />

PROJECT CLASSIFICATION<br />

Imminent Need or Emergency:<br />

Special Opportunity<br />

Existing Need: Plans and<br />

Approval Complete<br />

Existing or Developing Need:<br />

Minor Plan Approvals Needed<br />

Plans Under Preparation: Need<br />

Acquistion, Assessment, or<br />

3rd Party Approvals<br />

X D Growing Demand: No plans,<br />

need further study or lengthy<br />

approval process<br />

E Future need as growth<br />

continues; other projects<br />

completed, or funding obtained<br />

X ART<br />

Description: Proposed is the construction <strong>of</strong> a<br />

full diamond interchange at Interstate 35/80.<br />

Justification: This new interchange would ease<br />

the congestion at the Iowa 141 interchange and<br />

provide better access to the surrounding area.<br />

Project Status: The <strong>City</strong> and Polk County have<br />

placed the Interchange Justification Report work<br />

on hold pending additional review with the IDOT<br />

and MPO.<br />

Effect on Operating Budget: No change in<br />

operating budget.<br />

Hazard Mitigation Project: Tentatively<br />

designated by <strong>City</strong> staff as an eligible project.<br />

PROJECT STATUS<br />

Completed<br />

Studies/Need Asses. 05<br />

Survey/ Prel. Design<br />

Acquisition<br />

Assessment Schedule<br />

Plans<br />

State/Federal Approval<br />

Bid/Construction<br />

Other<br />

In Year<br />

Future<br />

X<br />

X<br />

X<br />

X<br />

100