STREET<br />

100 th Street and NW 54 th Street Intersection<br />

COSTS ITEMIZED U nprogrammed<br />

(In 000's) TOTALS 2010 2011 2012 2013 2014 2015+<br />

Design 675.0 675.0<br />

Acquisition 75.0 75.0<br />

Construction 3,750.0 3,750.0<br />

TOTAL 4,500.0 - - - - 4,500.0 - -<br />

FUNDING SOURCES<br />

TIF 1,372.4 1,372.4<br />

STP 1,755.0 1,755.0<br />

Johnston 686.3 686.3<br />

Grimes 686.3 686.3<br />

TOTAL 4,500.0 - - - - 4,500.0 - -<br />

AA<br />

A<br />

B<br />

C<br />

PROJECT CLASSIFICATION<br />

Imminent Need or Emergency:<br />

Special Opportunity<br />

Existing Need: Plans and<br />

Approval Complete<br />

Existing or Developing Need:<br />

Minor Plan Approvals Needed<br />

Plans Under Preparation: Need<br />

Acquistion, Assessment, or<br />

3rd Party Approvals<br />

X D Growing Demand: No plans,<br />

need further study or lengthy<br />

approval process<br />

E Future need as growth<br />

continues; other projects<br />

completed, or funding obtained<br />

X ART<br />

Description: Proposed is the reconstruction <strong>of</strong> the<br />

intersection at 100 th Street and NW 54 th Street.<br />

This will be a joint project between the Cities <strong>of</strong><br />

Johnston, Grimes, and <strong>Urbandale</strong>.<br />

Justification: As the volume <strong>of</strong> traffic increases<br />

on 100 th Street and NW 54 th Street, the existing<br />

temporary asphalt paving will deteriorate. (Note,<br />

NW 54 th Street becomes Waterford Road in<br />

<strong>Urbandale</strong>).<br />

Project Status: Plans are in the conceptual stage.<br />

STP Minor Construction funding has been applied<br />

for FY2013.<br />

Effect on Operating Budget: Decrease in<br />

maintenance costs due to the elimination <strong>of</strong> the<br />

asphalt surface.<br />

PROJECT STATUS<br />

Completed<br />

In Year<br />

Studies/Need Asses. 05<br />

Survey/ Prel. Design 13<br />

Acquisition 13<br />

Assessment Schedule<br />

Plans 13<br />

State/Federal Approval 13<br />

Bid/Construction 13<br />

Other<br />

Future<br />

102