Capital Improvements Program (CIP) Document - City of Urbandale
Capital Improvements Program (CIP) Document - City of Urbandale
Capital Improvements Program (CIP) Document - City of Urbandale
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
STREET<br />
100 th Street and NW 54 th Street Intersection<br />
COSTS ITEMIZED U nprogrammed<br />
(In 000's) TOTALS 2010 2011 2012 2013 2014 2015+<br />
Design 675.0 675.0<br />
Acquisition 75.0 75.0<br />
Construction 3,750.0 3,750.0<br />
TOTAL 4,500.0 - - - - 4,500.0 - -<br />
FUNDING SOURCES<br />
TIF 1,372.4 1,372.4<br />
STP 1,755.0 1,755.0<br />
Johnston 686.3 686.3<br />
Grimes 686.3 686.3<br />
TOTAL 4,500.0 - - - - 4,500.0 - -<br />
AA<br />
A<br />
B<br />
C<br />
PROJECT CLASSIFICATION<br />
Imminent Need or Emergency:<br />
Special Opportunity<br />
Existing Need: Plans and<br />
Approval Complete<br />
Existing or Developing Need:<br />
Minor Plan Approvals Needed<br />
Plans Under Preparation: Need<br />
Acquistion, Assessment, or<br />
3rd Party Approvals<br />
X D Growing Demand: No plans,<br />
need further study or lengthy<br />
approval process<br />
E Future need as growth<br />
continues; other projects<br />
completed, or funding obtained<br />
X ART<br />
Description: Proposed is the reconstruction <strong>of</strong> the<br />
intersection at 100 th Street and NW 54 th Street.<br />
This will be a joint project between the Cities <strong>of</strong><br />
Johnston, Grimes, and <strong>Urbandale</strong>.<br />
Justification: As the volume <strong>of</strong> traffic increases<br />
on 100 th Street and NW 54 th Street, the existing<br />
temporary asphalt paving will deteriorate. (Note,<br />
NW 54 th Street becomes Waterford Road in<br />
<strong>Urbandale</strong>).<br />
Project Status: Plans are in the conceptual stage.<br />
STP Minor Construction funding has been applied<br />
for FY2013.<br />
Effect on Operating Budget: Decrease in<br />
maintenance costs due to the elimination <strong>of</strong> the<br />
asphalt surface.<br />
PROJECT STATUS<br />
Completed<br />
In Year<br />
Studies/Need Asses. 05<br />
Survey/ Prel. Design 13<br />
Acquisition 13<br />
Assessment Schedule<br />
Plans 13<br />
State/Federal Approval 13<br />
Bid/Construction 13<br />
Other<br />
Future<br />
102