STREET<br />

Meredith Drive: 156 th Street to 170 th Street<br />

COSTS ITEMIZED Unprogrammed<br />

(In 000's) TOTALS 2010 2011 2012 2013 2014 2015+<br />

Design 427.7 427.7<br />

Acquisition 150.0 150.0<br />

Construction 2,851.2 2,851.2<br />

TOTAL 3,428.9 - - - - - - 3,428.9<br />

FUNDING SOURCES<br />

GOB 1,995.1 1,995.1<br />

Spc Assmt 576.6 576.6<br />

Clive 857.2 857.2<br />

TOTAL 3,428.9 - - - - - - 3,428.9<br />

AA<br />

A<br />

B<br />

C<br />

PROJECT CLASSIFICATION<br />

Imminent Need or Emergency:<br />

Special Opportunity<br />

Existing Need: Plans and<br />

Approval Complete<br />

Existing or Developing Need:<br />

Minor Plan Approvals Needed<br />

Plans Under Preparation: Need<br />

Acquistion, Assessment, or<br />

3rd Party Approvals<br />

X D Growing Demand: No plans,<br />

need further study or lengthy<br />

approval process<br />

X<br />

E<br />

Future need as growth<br />

continues; other projects<br />

completed, or funding obtained<br />

ART<br />

Description: Proposed is the construction <strong>of</strong> the<br />

first two lanes <strong>of</strong> a future four-lane roadway for<br />

Meredith Drive beginning at 156 th Street and<br />

extending west to 170 th Street. The <strong>City</strong> <strong>of</strong> Clive<br />

would pay 25% <strong>of</strong> the project, since the west half<br />

mile is in Clive on the south side <strong>of</strong> Meredith<br />

Drive.<br />

Justification: Meredith Drive is a major<br />

east/west arterial and will provide access for this<br />

area as development occurs.<br />

Project Status: The project is in the development<br />

stage and preliminary plans are not completed.<br />

Effect on Operating Budget: Minimal decrease<br />

due to the elimination <strong>of</strong> an asphalt street and<br />

ditches.<br />

PROJECT STATUS<br />

Studies/Need Asses.<br />

Survey/ Prel. Design<br />

Acquisition<br />

Assessment Schedule<br />

Plans<br />

State/Federal Approval<br />

Bid/Construction<br />

Other<br />

Completed<br />

In Year<br />

Future<br />

X<br />

X<br />

X<br />

X<br />

X<br />

X<br />

85