Capital Improvements Program (CIP) Document - City of Urbandale
Capital Improvements Program (CIP) Document - City of Urbandale
Capital Improvements Program (CIP) Document - City of Urbandale
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
STREET<br />
Meredith Drive: 142 nd Street to 154 th Street<br />
COSTS ITEMIZED Unprogrammed<br />
(In 000's) TOTALS 2010 2011 2012 2013 2014 2015+<br />
Design 427.7 427.7<br />
Acquisition 150.0 150.0<br />
Construction 3,357.2 3,357.2<br />
TOTAL 3,934.9 - - - - 3,934.9 - -<br />
FUNDING SOURCES<br />
GOB 3,588.9 3,588.9<br />
Spc Assmt 346.0 346.0<br />
-<br />
TOTAL 3,934.9 - - - - 3,934.9 - -<br />
AA<br />
A<br />
B<br />
C<br />
PROJECT CLASSIFICATION<br />
Imminent Need or Emergency:<br />
Special Opportunity<br />
Existing Need: Plans and<br />
Approval Complete<br />
Existing or Developing Need:<br />
Minor Plan Approvals Needed<br />
Plans Under Preparation: Need<br />
Acquistion, Assessment, or<br />
3rd Party Approvals<br />
X D Growing Demand: No plans,<br />
need further study or lengthy<br />
approval process<br />
X<br />
E<br />
Future need as growth<br />
continues; other projects<br />
completed, or funding obtained<br />
ART<br />
Description: Proposed is the construction <strong>of</strong> a<br />
four lane roadway for Meredith Drive, beginning<br />
at 142 nd Street and extending west to 154 th Street.<br />
Justification: Meredith Drive is a major<br />
east/west arterial and will provide access for<br />
western <strong>Urbandale</strong> as development occurs.<br />
Project Status: The project is in the development<br />
stage and preliminary plans are not completed.<br />
Effect on Operating Budget: Minimal decrease<br />
due to the elimination <strong>of</strong> an asphalt street and<br />
ditches.<br />
PROJECT STATUS<br />
Completed<br />
In Year<br />
Studies/Need Asses. 09<br />
Survey/ Prel. Design 09<br />
Acquisition 09<br />
Assessment Schedule 09<br />
Plans 10<br />
State/Federal Approval<br />
Bid/Construction 13<br />
Other<br />
Future<br />
84