09.01.2015 Views

Capital Improvements Program (CIP) Document - City of Urbandale

Capital Improvements Program (CIP) Document - City of Urbandale

Capital Improvements Program (CIP) Document - City of Urbandale

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Page (In 000's) 2010 2011 2012 2013 2014 2015+<br />

PARKS (Continued)<br />

47 ……….. WCRP: Acquisition 125.0 212.5<br />

49 ……….. Art WCRP: Trail Spine - Douglas Parkway to Meredith Drive 735.0 (the "Bob Layton Trail")<br />

50 ……….. Art WCRP: Trail System - Interior Access 251.0 920.6<br />

52 ……….. Art WCRP: Park Roadway System - Aurora Avenue 257.7 245.9<br />

53 ……….. Art WCRP: Open-Air Park Shelters / Picnic Areas 410.0 150.0<br />

54 ……….. Art WCRP: Enclosed Regional Park Shelter-152nd Street and Meredith Drive 925.0<br />

55 ……….. Art WCRP: Outdoor Aquatic Center 40.0 5,000.0<br />

56 ……….. Art WCRP: Nature Center 2,875.0<br />

57 ……….. Art WCRP: Regional Playground in Facilities Area - 152nd Street and Meredith Drive 400.0 908.0<br />

58 ……….. WCRP: Annual Landscaping 35.0 35.0 35.0 35.0 35.0 70.0<br />

59 ……….. WCRP: Specialized Landscaping, Picnic Areas, Passive Recreation Areas 35.0 35.0 80.0<br />

Sub-Total $ 22,168.0 1,610.0 2,230.0 1,825.5 175.0 2,623.3 13,704.2<br />

PUBLIC WORKS<br />

BRIDGES<br />

61 ……….. HzMit Aurora Avenue: Walnut Creek Bridge 75.0 960.0<br />

62 ……….. Art HzMit Meredith Drive: Walnut Creek Bridge 1,438.9<br />

63 ……….. Art HzMit 156th Street: Walnut Creek Bridge 1,702.0<br />

Sub-Total $ 4,175.9<br />

75.0 960.0 - 1,438.9 - 1,702.0<br />

SIDEWALKS<br />

65 ……….. Various Locations 335.5 335.5 335.5 335.5 335.5 335.5<br />

66 ……….. Deer Creek Trail: Connection to Raccoon Valley Trail 150.0<br />

Sub-Total $ 2,163.0 335.5 335.5 335.5 335.5 485.5 335.5<br />

STORM SEWERS<br />

69 ……….. HzMit Drainage <strong>Improvements</strong>-Various Locations 50.0 50.0 125.0 125.0 125.0 400.0<br />

70 ……….. 104th Street and Justin Drive 36.0<br />

Sub-Total $ 911.0<br />

50.0 50.0 125.0 125.0 161.0 400.0<br />

STREETS<br />

73 ……….. Annual Concrete Street Rehabilitation 723.1<strong>Program</strong><br />

748.4 445.6 801.7 276.5 4,384.0<br />

74 ……….. Aurora Avenue Preservation Project: 70th Street to 86th Street 862.5<br />

75 ……….. Aurora Avenue and 112th Street 310.0<br />

76 ……….. Aurora Avenue: 128th Street to 1,009.4 142nd Street<br />

2,609.2<br />

77 ……….. Art Aurora Avenue: Walnut Creek Regional Park857.0<br />

78 ……….. Deer Creek Subdivision: Street Reconstruction<br />

850.0<br />

79 ……….. Douglas Avenue Median 50.0 4,634.3<br />

80 ……….. Douglas Avenue Preservation Project: 100th Street to 111th 561.0 Street<br />

81 ……….. Art HzMit Douglas Parkway: 156th Street 1,939.5 to West Corporate Limit<br />

82 ……….. Art Meredith Drive: 86th Street to NW <strong>Urbandale</strong> 50.0 Drive 2,059.0<br />

83 ……….. Art Meredith Drive: 128th Street to 142nd Street 4,088.9<br />

84 ……….. Art Meredith Drive: 142nd Street to 154th Street 3,934.9<br />

A.2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!