STREET<br />
156 th Street: Waterford Road to Meadow Drive<br />
COSTS ITEMIZED Unprogrammed<br />
(In 000's) TOTALS 2010 2011 2012 2013 2014 2015+<br />
Design 427.7 427.7<br />
Acquisition 150.0 150.0<br />
Construction 2,857.2 2,857.2<br />
TOTAL 3,434.9 - - - - - - 3,434.9<br />
FUNDING SOURCES<br />
GOB 2,666.1 2,666.1<br />
Spc Assmt 768.8 768.8<br />
-<br />
TOTAL 3,434.9 - - - - - - 3,434.9<br />
AA<br />
A<br />
B<br />
C<br />
PROJECT CLASSIFICATION<br />
Imminent Need or Emergency:<br />
Special Opportunity<br />
Existing Need: Plans and<br />
Approval Complete<br />
Existing or Developing Need:<br />
Minor Plan Approvals Needed<br />
Plans Under Preparation: Need<br />
Acquistion, Assessment, or<br />
3rd Party Approvals<br />
X D Growing Demand: No plans,<br />
need further study or lengthy<br />
approval process<br />
X<br />
E<br />
Future need as growth<br />
continues; other projects<br />
completed, or funding obtained<br />
ART<br />
Description: Proposed is the construction <strong>of</strong><br />
156 th Street as a two lane roadway, with future<br />
plans to expand to four lanes. Related<br />
improvements include grading, storm sewers and<br />
street lighting.<br />
Justification: 156 th Street is an arterial street that<br />
carries a substantial amount <strong>of</strong> the north/south<br />
traffic in this area. One-half <strong>of</strong> the cost <strong>of</strong> the<br />
pavement would be assessed to the adjoining<br />
property owners.<br />
Project Status: The future project is in the<br />
development stage and preliminary plans are not<br />
completed.<br />
Effect on Operating Budget: This project would<br />
decrease the operating budget by approximately<br />
$10,000 per year.<br />
PROJECT STATUS<br />
Studies/Need Asses.<br />
Survey/ Prel. Design<br />
Acquisition<br />
Assessment Schedule<br />
Plans<br />
State/Federal Approval<br />
Bid/Construction<br />
Other<br />
Completed<br />
In Year<br />
Future<br />
X<br />
X<br />
X<br />
X<br />
X<br />
X<br />
112