STREET<br />
Meredith Drive: 86 th Street to NW <strong>Urbandale</strong> Dr.<br />
COSTS ITEMIZED U nprogrammed<br />
(In 000's) TOTALS 2010 2011 2012 2013 2014 2015+<br />
Design 283.0 50.0 233.0<br />
Acquisition 25.0 25.0<br />
Construction 1,801.0 1,801.0<br />
TOTAL 2,109.0 - - 50.0 2,059.0 - - -<br />
FUNDING SOURCES<br />
GOB 2,109.0 50.0 2,059.0<br />
-<br />
-<br />
TOTAL 2,109.0 - - 50.0 2,059.0 - - -<br />
AA<br />
A<br />
B<br />
C<br />
PROJECT CLASSIFICATION<br />
Imminent Need or Emergency:<br />
Special Opportunity<br />
Existing Need: Plans and<br />
Approval Complete<br />
Existing or Developing Need:<br />
Minor Plan Approvals Needed<br />
Plans Under Preparation: Need<br />
Acquistion, Assessment, or<br />
3rd Party Approvals<br />
X D Growing Demand: No plans,<br />
need further study or lengthy<br />
approval process<br />
E Future need as growth<br />
continues; other projects<br />
completed, or funding obtained<br />
X ART<br />
Description: Proposed is the widening <strong>of</strong> Meredith<br />
Drive, from a 27 foot wide two lane street, to a 49<br />
foot wide four lane street, between 86 th Street and<br />
NW <strong>Urbandale</strong> Drive. Additional improvements<br />
would include grading and storm sewers.<br />
Justification: As development occurs to the west,<br />
the volume <strong>of</strong> traffic continues to increase on<br />
Meredith Drive, west <strong>of</strong> 86 th Street. This street will<br />
be required to be widened to four lanes when<br />
traffic volumes approach 14,000 vehicles per day.<br />
Project Status: Plans are in the conceptual stage.<br />
Effect on Operating Budget: Increase<br />
approximately $1,000 a year.<br />
PROJECT STATUS<br />
Completed<br />
In Year<br />
Studies/Need Asses. 09<br />
Survey/ Prel. Design 09<br />
Acquisition<br />
Assessment Schedule<br />
Plans 09<br />
State/Federal Approval 10<br />
Bid/Construction 12<br />
Other<br />
Future<br />