STREET<br />
121 st Street <strong>Improvements</strong>: Douglas Parkway to<br />
Meredith Drive<br />
COSTS ITEMIZED U nprogrammed<br />
(In 000's) TOTALS 2010 2011 2012 2013 2014 2015+<br />
Design 100.0 100.0<br />
Acquisition -<br />
Construction 2,700.0 65.0 2,635.0<br />
TOTAL 2,800.0 - 65.0 100.0 2,635.0 - - -<br />
FUNDING SOURCES<br />
State 1,350.0 32.5 1,317.5<br />
TIF 1,450.0 @ 32.5 100.0 1,317.5<br />
-<br />
Sub-Total 2,800.0 - 65.0 100.0 2,635.0 - - -<br />
Less Prior TIF Debt Issued (32.5)<br />
TOTAL 2,767.5 32.5 100.0 2,635.0 - - -<br />
@ the TIF was issued in 2009--have 18 months from date issued to complete.<br />
AA<br />
A<br />
PROJECT CLASSIFICATION<br />
Imminent Need or Emergency:<br />
Special Opportunity<br />
Existing Need: Plans and<br />
Approval Complete<br />
X B Existing or Developing Need:<br />
Minor Plan Approvals Needed<br />
Description: Proposed is the addition <strong>of</strong> a south<br />
bound left turn lane on 121 st Street at Douglas<br />
Parkway, and the widening <strong>of</strong> 121 st Street to five<br />
lanes from Douglas Parkway to Meredith Drive.<br />
Justification: This project would add capacity to<br />
121 st Street to ease congestion in the area.<br />
C<br />
D<br />
E<br />
Plans Under Preparation: Need<br />
Acquistion, Assessment, or<br />
3rd Party Approvals<br />
Growing Demand: No plans,<br />
need further study or lengthy<br />
approval process<br />
Future need as growth<br />
continues; other projects<br />
completed, or funding obtained<br />
Project Status: This project is in the planning<br />
stage. Phase I: 2010: Proposed is the addition <strong>of</strong> a<br />
south bound left turn lane on 121 st Street at<br />
Douglas Parkway. Phase II: 2012: In addition,<br />
approximately 2,600 feet <strong>of</strong> 121 st Street would be<br />
widened from a two lane width to a five lane width<br />
to provide additional capacity. The <strong>City</strong> will<br />
submit an application to the State for funding<br />
assistance for both phases.<br />
PROJECT STATUS<br />
Completed<br />
In Year<br />
Studies/Need Asses.<br />
Survey/ Prel. Design 09<br />
Acquisition<br />
Assessment Schedule<br />
Plans 11<br />
State/Federal Approval<br />
Bid/Construction 10, 12<br />
Other<br />
Future<br />
Effect on Operating Budget: None<br />
105