Capital Improvements Program (CIP) Document - City of Urbandale

Capital Improvements Program (CIP) Document - City of Urbandale

Capital Improvements Program (CIP) Document - City of Urbandale

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

STREET<br />

128 th Street: Hickman Road to Douglas Parkway<br />

COSTS ITEMIZED U nprogrammed<br />

(In 000's) TOTALS 2010 2011 2012 2013 2014 2015+<br />

Design 164.0 164.0<br />

Acquisition 100.0 100.0<br />

Construction 1,836.0 1,836.0<br />

TOTAL 2,100.0 - - - - - 2,100.0 -<br />

FUNDING SOURCES<br />

GOB 2,100.0 2,100.0<br />

-<br />

-<br />

TOTAL 2,100.0 - - - - - 2,100.0 -<br />

AA<br />

A<br />

B<br />

C<br />

PROJECT CLASSIFICATION<br />

Imminent Need or Emergency:<br />

Special Opportunity<br />

Existing Need: Plans and<br />

Approval Complete<br />

Existing or Developing Need:<br />

Minor Plan Approvals Needed<br />

Plans Under Preparation: Need<br />

Acquistion, Assessment, or<br />

3rd Party Approvals<br />

X D Growing Demand: No plans,<br />

need further study or lengthy<br />

approval process<br />

X<br />

E<br />

Future need as growth<br />

continues; other projects<br />

completed, or funding obtained<br />

ART<br />

Description: Proposed is the widening <strong>of</strong> 128 th<br />

Street to a four-lane roadway with left turns at all<br />

full movement intersections from Hickman Road<br />

to Douglas Parkway.<br />

Justification: When traffic volumes reach 13,000<br />

to 14,000 vehicles per day, this roadway will need<br />

to be widened to two through lanes in each<br />

direction, with left turn lanes at all full movement<br />

intersections. This is the last section <strong>of</strong> the twolane<br />

roadway on 128 th Street from Hickman Road<br />

to the north corporate line which is ½ mile north<br />

<strong>of</strong> Meredith Drive.<br />

Project Status: This project will be designed in<br />

the future for construction in 2014.<br />

Effect on Operating Budget: None.<br />

PROJECT STATUS<br />

Completed<br />

In Year<br />

Studies/Need Asses.<br />

X<br />

Survey/ Prel. Design 12<br />

Acquisition 12<br />

Assessment Schedule<br />

Plans 12<br />

State/Federal Approval<br />

Bid/Construction 14<br />

Other<br />

Future<br />

106