STREET<br />

Douglas Avenue Median<br />

COSTS ITEMIZED Unprogrammed<br />

(In 000's) TOTALS 2010 2011 2012 2013 2014 2015+<br />

Design 582.8 50.0 532.8<br />

Acquisition -<br />

Construction 4,101.5 4,101.5<br />

TOTAL 4,684.3 - - 50.0 - - - 4,634.3<br />

FUNDING SOURCES<br />

GOB 4,684.3 50.0 4,634.3<br />

-<br />

-<br />

TOTAL 4,684.3 - - 50.0 - - - 4,634.3<br />

AA<br />

A<br />

B<br />

C<br />

PROJECT CLASSIFICATION<br />

Imminent Need or Emergency:<br />

Special Opportunity<br />

Existing Need: Plans and<br />

Approval Complete<br />

Existing or Developing Need:<br />

Minor Plan Approvals Needed<br />

Plans Under Preparation: Need<br />

Acquistion, Assessment, or<br />

3rd Party Approvals<br />

X D Growing Demand: No plans,<br />

need further study or lengthy<br />

approval process<br />

E Future need as growth<br />

continues; other projects<br />

completed, or funding obtained<br />

Not Art eligible.<br />

PROJECT STATUS<br />

Completed<br />

In Year<br />

Future<br />

Studies/Need Asses.<br />

Survey/ Prel. Design 08 11 X<br />

Acquisition<br />

Assessment Schedule<br />

Plans<br />

X<br />

State/Federal Approval<br />

Bid/Construction<br />

X<br />

Other<br />

Description: Proposed in 2011 is a consultant to<br />

study the replacement <strong>of</strong> the current rural cross-section<br />

<strong>of</strong> Douglas Avenue with an urban cross-section. This<br />

project would install curbs, gutters, and storm sewer;<br />

and fill the median and side ditches. Douglas<br />

Avenue/Parkway is the <strong>City</strong>’s “east-west spine”, and is<br />

the <strong>City</strong>’s traditional “main” street.<br />

Justification: The project would reduce the amount <strong>of</strong><br />

maintenance required on Douglas Avenue, and would<br />

improve the appearance <strong>of</strong> this road. The current side<br />

and median ditches are susceptible to erosion and<br />

require continuous maintenance in the form <strong>of</strong> ditch<br />

cleaning and mowing.<br />

Project Status: A landscape architect would need to<br />

be selected to design beautification plans for the<br />

corridor, including identifying possible locations for<br />

public art and landscaping features. The plans are in<br />

the conceptual stage and would be constructed in seven<br />

phases; and would need to be advanced in order to be<br />

completed by the 2017 Centennial. Construction costs<br />

estimated for each phase. Although the years are<br />

unprogrammed, the tentative phases identified by staff<br />

are: Phase 1 ($848.8K) from 100 th St. to 109 th St.;<br />

Phase 2 ($334.8K) from 86 th St. to North Walnut<br />

Creek; Phase 3 ($866.8K) from Elm Drive to 83 rd<br />

St.; Phase 4 ($918.8K) from 83 rd St. to 86 th St., and<br />

from North Walnut Creek to 92 nd St.; Phase 5<br />

($242.8K) from 92 nd St. to Mary Lynn Dr. Phase 6<br />

($563.5K) from Mary Lynn Drive to Patricia Drive;<br />

and Phase 7 ($908.8K) would complete the project<br />

from Patricia Drive to 100 th Street.<br />

Effect on Operating Budget: Decrease due to less<br />

maintenance costs.<br />

79