STREET<br />
Douglas Avenue Median<br />
COSTS ITEMIZED Unprogrammed<br />
(In 000's) TOTALS 2010 2011 2012 2013 2014 2015+<br />
Design 582.8 50.0 532.8<br />
Acquisition -<br />
Construction 4,101.5 4,101.5<br />
TOTAL 4,684.3 - - 50.0 - - - 4,634.3<br />
FUNDING SOURCES<br />
GOB 4,684.3 50.0 4,634.3<br />
-<br />
-<br />
TOTAL 4,684.3 - - 50.0 - - - 4,634.3<br />
AA<br />
A<br />
B<br />
C<br />
PROJECT CLASSIFICATION<br />
Imminent Need or Emergency:<br />
Special Opportunity<br />
Existing Need: Plans and<br />
Approval Complete<br />
Existing or Developing Need:<br />
Minor Plan Approvals Needed<br />
Plans Under Preparation: Need<br />
Acquistion, Assessment, or<br />
3rd Party Approvals<br />
X D Growing Demand: No plans,<br />
need further study or lengthy<br />
approval process<br />
E Future need as growth<br />
continues; other projects<br />
completed, or funding obtained<br />
Not Art eligible.<br />
PROJECT STATUS<br />
Completed<br />
In Year<br />
Future<br />
Studies/Need Asses.<br />
Survey/ Prel. Design 08 11 X<br />
Acquisition<br />
Assessment Schedule<br />
Plans<br />
X<br />
State/Federal Approval<br />
Bid/Construction<br />
X<br />
Other<br />
Description: Proposed in 2011 is a consultant to<br />
study the replacement <strong>of</strong> the current rural cross-section<br />
<strong>of</strong> Douglas Avenue with an urban cross-section. This<br />
project would install curbs, gutters, and storm sewer;<br />
and fill the median and side ditches. Douglas<br />
Avenue/Parkway is the <strong>City</strong>’s “east-west spine”, and is<br />
the <strong>City</strong>’s traditional “main” street.<br />
Justification: The project would reduce the amount <strong>of</strong><br />
maintenance required on Douglas Avenue, and would<br />
improve the appearance <strong>of</strong> this road. The current side<br />
and median ditches are susceptible to erosion and<br />
require continuous maintenance in the form <strong>of</strong> ditch<br />
cleaning and mowing.<br />
Project Status: A landscape architect would need to<br />
be selected to design beautification plans for the<br />
corridor, including identifying possible locations for<br />
public art and landscaping features. The plans are in<br />
the conceptual stage and would be constructed in seven<br />
phases; and would need to be advanced in order to be<br />
completed by the 2017 Centennial. Construction costs<br />
estimated for each phase. Although the years are<br />
unprogrammed, the tentative phases identified by staff<br />
are: Phase 1 ($848.8K) from 100 th St. to 109 th St.;<br />
Phase 2 ($334.8K) from 86 th St. to North Walnut<br />
Creek; Phase 3 ($866.8K) from Elm Drive to 83 rd<br />
St.; Phase 4 ($918.8K) from 83 rd St. to 86 th St., and<br />
from North Walnut Creek to 92 nd St.; Phase 5<br />
($242.8K) from 92 nd St. to Mary Lynn Dr. Phase 6<br />
($563.5K) from Mary Lynn Drive to Patricia Drive;<br />
and Phase 7 ($908.8K) would complete the project<br />
from Patricia Drive to 100 th Street.<br />
Effect on Operating Budget: Decrease due to less<br />
maintenance costs.<br />
79