STREET<br />
75 th Street and Douglas Avenue: Turn Lanes<br />
COSTS ITEMIZED Unprogrammed<br />
(In 000's) TOTALS 2010 2011 2012 2013 2014 2015+<br />
Design 66.0 66.0<br />
Acquisition 150.0 150.0<br />
Construction 440.0 440.0<br />
TOTAL 656.0 - - - - - - 656.0<br />
FUNDING SOURCES<br />
GOB 656.0 656.0<br />
-<br />
-<br />
TOTAL 656.0 - - - - - - 656.0<br />
AA<br />
A<br />
B<br />
C<br />
PROJECT CLASSIFICATION<br />
Imminent Need or Emergency:<br />
Special Opportunity<br />
Existing Need: Plans and<br />
Approval Complete<br />
Existing or Developing Need:<br />
Minor Plan Approvals Needed<br />
Plans Under Preparation: Need<br />
Acquistion, Assessment, or<br />
3rd Party Approvals<br />
X D Growing Demand: No plans,<br />
need further study or lengthy<br />
approval process<br />
E<br />
Future need as growth<br />
continues; other projects<br />
completed, or funding obtained<br />
Description: Proposed is the construction <strong>of</strong> east<br />
bound and west bound left turn lanes on Douglas<br />
Avenue and a new traffic signal.<br />
Justification: Adding left turn lanes would<br />
increase the capacity <strong>of</strong> the intersection and<br />
reduce travel time through the intersection.<br />
Project Status: The project is in the development<br />
stage.<br />
Effect on Operating Budget: None.<br />
PROJECT STATUS<br />
Completed<br />
In Year<br />
Studies/Need Asses. 09<br />
Survey/ Prel. Design<br />
Acquisition<br />
Assessment Schedule<br />
Plans<br />
State/Federal Approval<br />
Bid/Construction<br />
Other<br />
Future<br />
X<br />
X<br />
X<br />
X<br />