Tags and the Project Database<br />

Using the Tags Toolbar<br />

The Tags toolbar provides a text box and several tools (shortcuts) that enable you to create, locate, and access<br />

different tags, functions, and tag properties.<br />

Global Replace Tool<br />

Tags tools<br />

When clicking on the Global Replace tool from the Tag Properties Toolbar, the following window displays:<br />

Global Replace dialog<br />

From the Global Replace dialog, you can replace any tag(s) from all documents (screens and worksheets) of the<br />

whole project. You can edit both the From and the To column.<br />

When replacing composed tags (array size > 0 and/or Type = Class), you can configure a specific array<br />

position (for example, TagA[1] ) or class member (for example, TagB.MemberX ) or both (for example,<br />

TagC[3].MemberY ). If you configure only the Main Tag Name (for example, TagC ) in the From column, all tags<br />

from this main tag will be modified for the tag configured in the To column.<br />

If an invalid replacement is configured (for example, replace the Main Tag tag from a class type tag for a simple<br />

tag (not a class tag), the OK button will be disabled. When the OK button is pressed, the tags configured on the<br />

Global Replace dialog will be replaced in the order that they were configured on the dialog interface.<br />

Note: You must close all documents (screens and worksheets) before executing this command.<br />

When changing the tag name on the Project Tags database worksheet, IWS will ask you if you intend to<br />

replace this tag through the whole project.<br />

The Replace option will be created in the Edit menu. By using this option, the Global Replace dialog is prompted,<br />

however, the changes are applied only the current screen or worksheet in focus.<br />

Replacing project tags in a document or screen object<br />

To replace all occurences of a tag in the current document, do one of the following:<br />

• On the Home tab of the ribbon, in the Tags group, click Replace; or<br />

• On the Graphics tab of the ribbon, in the Editing group, click Replace.<br />

To replace all occurences of a tag in a screen object, double-click the object to open its Object Properties dialog<br />

and then click Replace.<br />

All of these methods will open the Replace dialog, which is descibed below.<br />

<strong>InduSoft</strong> Web Studio Page 133