18.01.2015 Views

Technical Reference Manual - InduSoft

Technical Reference Manual - InduSoft

Technical Reference Manual - InduSoft

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

About collaboration and source control<br />

c) In the Work Items list, select the work item(s) with which the changes should be associated.<br />

d) Click Check In.<br />

The Pending Changes dialog box is closed, and the selected files are checked into source control. In the<br />

Project Explorer, you will see that the files no longer have either the "add" badge or the "check" badge.<br />

Please note that when you right-click files in the Project Explorer, there are two other choices on the shortcut<br />

menu: Check In and Undo Pending Change. If you click either of these, the same Pending Changes dialog box is<br />

displayed but with certain options pre-selected. Everything else is the same as described in the steps above.<br />

<strong>InduSoft</strong> Web Studio Page 365

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!