25.01.2015 Views

Mr. Erik Milito - The House Committee on Natural Resources ...

Mr. Erik Milito - The House Committee on Natural Resources ...

Mr. Erik Milito - The House Committee on Natural Resources ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

10 API STANDARD 65-2<br />

3.1.62<br />

tieback casing<br />

Casing that is run from a liner hanger back to the wellhead after the initial liner and hanger system have been<br />

installed.<br />

3.1.63<br />

well barrier system<br />

Well barrier system is <strong>on</strong>e or more barriers that act in series to prevent flow. Well barriers that do not act in series are<br />

not c<strong>on</strong>sidered part of a single well barrier system, as they do not act together to increase total system reliability.<br />

3.1.64<br />

wellbore<br />

<str<strong>on</strong>g>The</str<strong>on</strong>g> borehole or cased hole secti<strong>on</strong>s in a well.<br />

3.1.65<br />

wellhead<br />

A device up<strong>on</strong> which the BOP and casing hangers are installed during the well c<strong>on</strong>structi<strong>on</strong> phase. Also the system of<br />

spools, valves and assorted adapters that provide pressure c<strong>on</strong>trol of a producing well. <str<strong>on</strong>g>The</str<strong>on</strong>g> wellhead also<br />

incorporates a means of hanging the producti<strong>on</strong> tubing and installing the christmas tree and surface flow-c<strong>on</strong>trol<br />

facilities in preparati<strong>on</strong> for the producti<strong>on</strong> phase of the well.<br />

3.1.66<br />

well integrity<br />

A quality or c<strong>on</strong>diti<strong>on</strong> of a well in being structurally sound with competent pressure seals by applicati<strong>on</strong> of technical,<br />

operati<strong>on</strong>al and organizati<strong>on</strong>al soluti<strong>on</strong>s that reduce the risk of unc<strong>on</strong>trolled release of formati<strong>on</strong> fluids throughout the<br />

well life cycle.<br />

3.1.67<br />

waiting <strong>on</strong> cement<br />

WOC<br />

Waiting <strong>on</strong> cement, normally expressed in hours, is the period of time after the cement has been placed until the time<br />

subsequent drilling or completi<strong>on</strong>s operati<strong>on</strong>s can resume.<br />

3.2 Abbreviati<strong>on</strong>s<br />

ACP<br />

API<br />

APB<br />

BHA<br />

BHCT<br />

BHP<br />

BHST<br />

BHT<br />

BOEMRE<br />

BOP<br />

CGSP<br />

CSGS<br />

ECD<br />

ECP<br />

annular casing pressure<br />

American Petroleum Institute<br />

annular pressure buildup<br />

bottom hole assembly<br />

bottom hole circulating temperature<br />

bottom hole pressure<br />

bottom hole static temperature<br />

bottom hole temperature<br />

Bureau of Ocean Energy Management Regulati<strong>on</strong> and Enforcement<br />

blowout preventer<br />

critical gel strength period<br />

critical static gel strength<br />

equivalent circulating density<br />

external casing packer

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!