25.01.2015 Views

Mr. Erik Milito - The House Committee on Natural Resources ...

Mr. Erik Milito - The House Committee on Natural Resources ...

Mr. Erik Milito - The House Committee on Natural Resources ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

74 API STANDARD 65-2<br />

vii) use proper cement densities and cement volumes.<br />

b) Operati<strong>on</strong>al c<strong>on</strong>siderati<strong>on</strong>s.<br />

1) Drilling:<br />

i) pre-treat drilling fluid with various particle size distributi<strong>on</strong> materials;<br />

ii) modify pre-treatment as required depending <strong>on</strong> wellbore reacti<strong>on</strong>;<br />

iii) apply planned treatments as needed to c<strong>on</strong>trol losses.<br />

2) Running casing:<br />

i) if possible cure the lost circulati<strong>on</strong> prior to running casing;<br />

ii) spot LCM in the open hole prior to running casing.<br />

3) Lost circulati<strong>on</strong> and near-wellbore stress computer modeling:<br />

i) optimize planned treatments based <strong>on</strong> actual c<strong>on</strong>diti<strong>on</strong>s.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!