Ec<strong>on</strong>omic Impacts of Oil and Gas Development <strong>on</strong> BLM Lands in Wyoming<br />

Figure 3. Oil and Gas EISs Currently Underway within Wyoming BLM Field Offices.<br />

Figure 4 shows the average oil and gas EIS cycle time for EISs that have been completed<br />

in the Rocky Mountain Regi<strong>on</strong> (Colorado, Utah, and Wyoming) since 1993 compared to<br />

the current estimated EIS cycle for projects currently undergoing NEPA analysis. <str<strong>on</strong>g>The</str<strong>on</strong>g><br />

average EIS completi<strong>on</strong> time for EISs between 1994 and 2005 was 38 m<strong>on</strong>ths. For<br />

projects with pending RODs, the average durati<strong>on</strong> of the EIS cycle is 43 m<strong>on</strong>ths as of<br />

March 2011. Note that the majority of these projects (listed in Table 6) have not released<br />

a DEIS and therefore, the EIS cycle time will increase as the NEPA process c<strong>on</strong>tinues.<br />