04.02.2015 Views

Life – a user's manual Part II - Boksidan

Life – a user's manual Part II - Boksidan

Life – a user's manual Part II - Boksidan

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Contractors<br />

When an action is decided, remains the often most difficult part of the work, namely, to ensure that it gets<br />

done. For smaller jobs, there are usually no other option than to hire craftsmen on a current account. Since it<br />

is not reasonable to request quotes for small jobs, moreover, it is not certain that it will be cheaper because<br />

they have to take in account possible problems that probably wont occure.<br />

However, for larger projects, it is often worthwhile, if possible, to bring in quotes from several contractors,<br />

especially if you do not already have very good contact with a suitable one. For example, the quotes for my<br />

last purchases from seemingly similar firms were distributed as follows:<br />

- Work 1: 570 000 SEK 1 090 000 SEK and 976 000 SEK.<br />

- Work 2: 34 016 SEK and 87 200 SEK.<br />

Whether you intend to use a trusted contractor to perform work on current account or with fixed fee one<br />

should make document that at least is a list of what to do. Since regardless of how careful and conscientious<br />

the contractor is, it is easy to forget.<br />

In more complex cases, it may be wise to hire a structural engineer who designs the plans and also hopefully<br />

reconcile during the work, that it is properly done. Since even a sloppy firm for a layman in the field may<br />

seem to do very serious work. As a layman it might also be difficult to assess the severity of the possible<br />

carelessness. In addition, in many cases, it is mandatory to appoint a quality manager. Which the<br />

construction company hopefully can provide.<br />

Notwithstanding other circumstances, it is usually easier for yourself and cheaper, the more small tasks you<br />

can collect to a single contractor. Since the contractor's travel and start-up time is shared between more<br />

tasks. Moreover, the latter, in particular in the case of painting, can use delays in a more efficient manner.<br />

Finally, it is important to have a well-known rule regarding projects in mind at all planning of future<br />

projects:<br />

Small projects often take more time than what was planned, and big ditto pull often cost more than<br />

planned.<br />

259

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!