EM & V<br />
Evaluation should focus on custom projects, in particular, large projects with relatively high savings or<br />
greater uncertainty in calculated estimates. A rigorous evaluation protocol that includes pre and post<br />
inspection should be used. The use of International Performance Measurement & Verification Protocol<br />
(IPMVP) will be applied to selected samples that make up key portions of the <strong>program</strong>’s gross energy<br />
savings projections. If IPMVP options are determined to be beyond the budget available or do not make<br />
sense given their cost for most projects, a statistically valid sample of projects can be evaluated, or<br />
thorough engineering reviews of project documentation and project information will be performed.<br />
Feedback from participants, trade allies, <strong>program</strong> managers and <strong>Entergy</strong> Account Representatives should<br />
be coordinated to evaluate <strong>program</strong> efficacy and identify recommendations for <strong>program</strong> improvements.<br />
Large Commercial Solutions<br />
Year 1 Year 2 Year 3<br />
Program Costs $1,952,564 $1,675,759 $1,568,052<br />
<strong>Inc</strong>entive Costs $984,547 $834,195 $781,440<br />
Non-<strong>Inc</strong>entive Costs $968,017 $841,565 $786,612<br />
Gross Annual kWh Savings 10,385,494 9,028,838 8,439,274<br />
Gross Annual kW Savings 1,502 1,320 1,250<br />
TRC Test 1.11<br />
PAC Test 2.6<br />
Participant Test 3.0<br />
Net to Gross Ratio 0.8<br />
Utility Levelized Cost $ / $0.052<br />
Utility Levelized Cost $ / kW $4,003.62<br />
No. of cust. in target group<br />
Cumulative Participants 59 118 177<br />
<strong>New</strong> Participants 59 59 59<br />
Program Cost per Participant $10,844 $10,844 $10,844<br />
NPV of Avg. Participant $50,158 $48,789 $47,079<br />
Avg. Part. Simple Payback 4.62 4.35 4.72<br />
Program Avoided CO2<br />
(Tons)<br />
3,801 3,408 3,216<br />
57 | P age