view user manual (pdf) - dyna-flo control valves
view user manual (pdf) - dyna-flo control valves
view user manual (pdf) - dyna-flo control valves
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Preparing for Operation<br />
M8, 14 deep (4x)<br />
23<br />
All air connections<br />
G 1/ 4 or 1 / 4 ”NPT<br />
10.25<br />
E<br />
65<br />
43<br />
7.75<br />
34<br />
25<br />
4.5<br />
12<br />
7<br />
33.5 33.5<br />
M6, 11 deep (4x)<br />
60<br />
∅<br />
50<br />
19,25<br />
1)<br />
M6, 8 deep (2x)<br />
M20, M25 or<br />
1/ 2 ”NPT (2x)<br />
87.2<br />
7.5 25.7 14,3<br />
129.5<br />
3.5<br />
1) Connection 238/Y2 only in<br />
double action version<br />
∅ 136.5<br />
82,5<br />
158.5<br />
235,3<br />
∅ 8h9<br />
Figure 3-4<br />
Dimensional drawing for positioner with metal housing in explosion proof<br />
version 6DR5xx5<br />
3.3 Assembly<br />
General<br />
!<br />
WARNING<br />
To avoid injury or mechanical damage to the positioner/mounting kit,<br />
the following order must be observed for assembly:<br />
1. Mechanical fitting of positioner this chapter<br />
2. Connection of electric power supply see chapter 3.4, p. 50<br />
3. Connection of pneumatic power supply see chapter 3.5, p. 62<br />
4. Put into operation see chapter 3.6, p. 63<br />
Please also observe the warning on page 51!<br />
SIPART PS2 Manual<br />
A5E00074631-03<br />
37