SERVICE MANUAL - Alarko Carrier
SERVICE MANUAL - Alarko Carrier
SERVICE MANUAL - Alarko Carrier
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
No.<br />
Part name<br />
Procedure<br />
Remarks<br />
3<br />
Control<br />
board<br />
assembly<br />
1. Disconnect lead wires and connectors connected<br />
from the control board assembly to other parts.<br />
1) Lead wires<br />
• Connection with terminal block : 7 wires<br />
(Red, Orange, Pink, Yellow, Black and two White<br />
wires)<br />
• Connection with compressor :<br />
Remove the fastons (3 places at compressor side).<br />
• Connection with reactor :<br />
Remove the connector from P08, 09<br />
(2P, White) and P12, P13 (2P, Gray).<br />
• Connection with 4-way valve :<br />
Remove the connector (3P).<br />
• Connection with case thermo. :<br />
Remove the connector (2P).<br />
2) Connectors<br />
• Sub-control board assembly side<br />
CN300 : Outdoor fan (3P, White)<br />
CN301 : Outdoor fan position detection (5P, White)<br />
CN601 : TO sensor (2P, White)<br />
CN602 : TD sensor (3P, White)<br />
CN603 : TS sensor (2P, Black)<br />
CN604 : TE sensor (2P, White)<br />
CN605 : TGa sensor (3P, Yellow)<br />
CN606 : TGb sensor (3P, White)<br />
CN607 : TGc sensor (3P, Green)<br />
CN608 : TGd sensor (2P, Blue)<br />
CN701 : A room pulse motor valve (6P, Yellow)<br />
CN702 : B room pulse motor valve (6P, White)<br />
CN703 : C room pulse motor valve (6P, Red)<br />
CN704 : D room pulse motor valve (6P, Blue)<br />
2. Disconnect cable connecting the main control board<br />
assembly side and sub-control board assembly.<br />
• Main control board assembly side<br />
CN04 : Connecting cable (3P, White)<br />
CN05 : Connecting cable (2P, White)<br />
CN06 : Connecting cable (5P, Red)<br />
CN13 : Connecting cable (5P, Red)<br />
• Sub-control board assembly side<br />
CN302 : Connecting cable (3P, White)<br />
CN303 : Connecting cable (2P, White)<br />
CN501 : Connecting cable (3P, Red)<br />
CN800 : Connecting cable (5P, Red)<br />
3. The connecting cable connecting compressor and<br />
P.C. board base and that connecting reactor and P.C.<br />
board base are fixed to the inverter box with bundling<br />
band. Cut off bundling band.<br />
4. The connecting cables of the main P.C. board base<br />
and the sub-P.C. board base are fixed with bundling<br />
band. Cut off bundling band.<br />
5. Remove the control board assembly from P.C. board<br />
base.<br />
1) Main control board assembly side<br />
CN601~<br />
CN608<br />
CN301 CN300<br />
CN704<br />
CN703<br />
CN702<br />
CN701<br />
CN300, CN302, CN303, CN501,<br />
CN604, CN606, CN701, CN702,<br />
CN703, CN704, 4-way valve<br />
connector, case thermo. connector<br />
at the sub-control board<br />
assembly side are connectors<br />
with locks. Therefore, remove the<br />
connector while pushing the part<br />
indicated by an arrow.<br />
P.C. board base<br />
P.C. board<br />
When mounting a new board,<br />
check that the board is correctly<br />
set in the groove of base holder<br />
of P.C. board base.<br />
• Remove two claws of P.C. board base, and remove upward the heat sink by hands.<br />
• Remove three screws fixing the heat sink and main control board assembly side.<br />
• Remove red, orange, brown, and black connecting cables connected to the diode<br />
block.<br />
• Replace the P.C. board with a new one.<br />
2) Sub-control board assembly side<br />
• Remove P.C. board base from the inverter box.<br />
• Remove three claws of P.C. board base, and replace the board with a new one.<br />
– 117 –