16.04.2015 Views

SERVICE MANUAL - Alarko Carrier

SERVICE MANUAL - Alarko Carrier

SERVICE MANUAL - Alarko Carrier

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

No.<br />

Part name<br />

Procedure<br />

Remarks<br />

3<br />

Control<br />

board<br />

assembly<br />

1. Disconnect lead wires and connectors connected<br />

from the control board assembly to other parts.<br />

1) Lead wires<br />

• Connection with terminal block : 7 wires<br />

(Red, Orange, Pink, Yellow, Black and two White<br />

wires)<br />

• Connection with compressor :<br />

Remove the fastons (3 places at compressor side).<br />

• Connection with reactor :<br />

Remove the connector from P08, 09<br />

(2P, White) and P12, P13 (2P, Gray).<br />

• Connection with 4-way valve :<br />

Remove the connector (3P).<br />

• Connection with case thermo. :<br />

Remove the connector (2P).<br />

2) Connectors<br />

• Sub-control board assembly side<br />

CN300 : Outdoor fan (3P, White)<br />

CN301 : Outdoor fan position detection (5P, White)<br />

CN601 : TO sensor (2P, White)<br />

CN602 : TD sensor (3P, White)<br />

CN603 : TS sensor (2P, Black)<br />

CN604 : TE sensor (2P, White)<br />

CN605 : TGa sensor (3P, Yellow)<br />

CN606 : TGb sensor (3P, White)<br />

CN607 : TGc sensor (3P, Green)<br />

CN608 : TGd sensor (2P, Blue)<br />

CN701 : A room pulse motor valve (6P, Yellow)<br />

CN702 : B room pulse motor valve (6P, White)<br />

CN703 : C room pulse motor valve (6P, Red)<br />

CN704 : D room pulse motor valve (6P, Blue)<br />

2. Disconnect cable connecting the main control board<br />

assembly side and sub-control board assembly.<br />

• Main control board assembly side<br />

CN04 : Connecting cable (3P, White)<br />

CN05 : Connecting cable (2P, White)<br />

CN06 : Connecting cable (5P, Red)<br />

CN13 : Connecting cable (5P, Red)<br />

• Sub-control board assembly side<br />

CN302 : Connecting cable (3P, White)<br />

CN303 : Connecting cable (2P, White)<br />

CN501 : Connecting cable (3P, Red)<br />

CN800 : Connecting cable (5P, Red)<br />

3. The connecting cable connecting compressor and<br />

P.C. board base and that connecting reactor and P.C.<br />

board base are fixed to the inverter box with bundling<br />

band. Cut off bundling band.<br />

4. The connecting cables of the main P.C. board base<br />

and the sub-P.C. board base are fixed with bundling<br />

band. Cut off bundling band.<br />

5. Remove the control board assembly from P.C. board<br />

base.<br />

1) Main control board assembly side<br />

CN601~<br />

CN608<br />

CN301 CN300<br />

CN704<br />

CN703<br />

CN702<br />

CN701<br />

CN300, CN302, CN303, CN501,<br />

CN604, CN606, CN701, CN702,<br />

CN703, CN704, 4-way valve<br />

connector, case thermo. connector<br />

at the sub-control board<br />

assembly side are connectors<br />

with locks. Therefore, remove the<br />

connector while pushing the part<br />

indicated by an arrow.<br />

P.C. board base<br />

P.C. board<br />

When mounting a new board,<br />

check that the board is correctly<br />

set in the groove of base holder<br />

of P.C. board base.<br />

• Remove two claws of P.C. board base, and remove upward the heat sink by hands.<br />

• Remove three screws fixing the heat sink and main control board assembly side.<br />

• Remove red, orange, brown, and black connecting cables connected to the diode<br />

block.<br />

• Replace the P.C. board with a new one.<br />

2) Sub-control board assembly side<br />

• Remove P.C. board base from the inverter box.<br />

• Remove three claws of P.C. board base, and replace the board with a new one.<br />

– 117 –

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!