Business Development Prospects<br />
To ensure the required resources for gas transportation through the Turkish Stream, projects<br />
are underway for UGSS expansion to insure gas supply to the South Stream and rehabilitation<br />
of the Petrovsk — Pisarevka section of the Urengoy — Novopskov pipeline.<br />
OAO <strong>Gazprom</strong> is also currently considering enhancement of the Blue Stream capacity.<br />
In addition, the Comprehensive Programme for Upgrading and Technical Re-equipment<br />
of Gas Transportation Facilities for 2011–2015 is currently being implemented in Russia with<br />
a focus on:<br />
— ensuring the planned gas transportation volumes;<br />
— ensuring the reliability of gas transport and supplies to consumers at all levels;<br />
— ensuring industrial and environmental safety of gas transportation facilities;<br />
— improving the economic efficiency of gas transportation, including resource and energy<br />
savings;<br />
To process the projected volumes of liquid hydrocarbons extracted during natural gas production<br />
at gas condensate fields in Western Siberia, the Company plans a capacity expansion and<br />
upgrade project on the Urengoy Condensate Pre-Transportation Preparation Plant by bringing<br />
output up to the rated capacity, construction of achimovsk deposit condensate and oil treatment<br />
and transportation facilities, completion of the construction of uncompleted sections of the Urengoy<br />
— Surgut gas condensate pipeline, and upgrade and re-equipment of the Surgut Condensate<br />
Stabilisation Plant.<br />
OAO <strong>Gazprom</strong>, under project financing arrangements, continues to implement a project to<br />
construct a gas chemical complex near Novy Urengoy, with gases recovered from de-ethanized<br />
gas condensate at the Urengoy Condensate Pre-Transportation Preparation Plant used as a key<br />
feedstock.<br />
There are ongoing initiatives to improve the quality of products (construction of a pentane-hexane<br />
fraction isomerization plant at the Surgut Condensate Stabilisation Plant, refurbishment<br />
of the motor fuel production facilities at the Astrakhan GPP to bring sulphur content down<br />
to Euro 4 and Euro 5 standards).<br />
In line with the OAO <strong>Gazprom</strong>’s policy of LNG market development and diversification of natural<br />
gas export supplies, the Company is implementing the Baltic LNG project, an LNG plant in<br />
the Leningrad Region. Target markets include the Atlantic region, including European countries<br />
not covered by Russian pipeline gas supplies (Spain, Portugal), Latin America, Middle East, India.<br />
Also, part of LNG volumes may be delivered to European bunker fuel market.<br />
Eastward development of gas business<br />
—<br />
—<br />
Goals<br />
Satisfy consumer<br />
needs in Russian<br />
Eastern regions.<br />
Grow the share<br />
of North East Asia<br />
markets up<br />
to 10–15%.<br />
Eastward development of the gas business is the Company’s promising area of development<br />
for decades to come. The State Eastern Gas Programme, coordinated by OAO <strong>Gazprom</strong>, is a key<br />
document to guide the gas industry development in Eastern Siberia and the Russian Far East.<br />
The Eastern Gas Programme provides for the gas production centres and a unified gas transportation<br />
system to be developed in parallel with the construction of gas processing and gas chemical<br />
plants, including helium and LNG plants.<br />
The natural resources in the East of Russia are rich enough to support new large gas and oil<br />
production centres covering both long-term internal demand from Russia’s eastern regions and<br />
exports to the Asia-Pacific countries, primarily to China.<br />