Performance Results<br />

67<br />

Major investment projects<br />

<strong>Gazprom</strong> Group’s gas transportation capex was RUB 434.4bn in 2014 (up by 14.2% y-o-y).<br />

The bulk of capex was used to finance the projects for the construction of the Bovanenkovo —<br />

Ukhta gas pipeline system, and for expanding the UGSS to supply gas to the South Stream gas<br />

pipeline.<br />

Commissioned gas transportation facilities in 2014<br />

In Russia:<br />

— 1,276.9 km of trunk pipelines and branch connections;<br />

— 4 CSs on the pipelines with an aggregate capacity of 416 MW (including 2 CSs on the Bovanenkovo — Ukhta trunk<br />

pipeline system with an aggregate capacity of 256 MW).<br />

Investments in underground gas storage totalled RUB 15.5bn in the reporting year, down by<br />

RUB 8.0bn (34.0%) y-o-y.<br />

The major part of capital expenditures in underground gas storage in Russia was used to<br />

upgrade gas production facilities at the Peschano-Umetskaya gas underground storage station,<br />

gas production facilities and compressors of the Yelshanskoye underground gas storage station,<br />

upgrade of the Sovkhoznoye UGSF, technical re-equipment of the Moscow Underground Gas<br />

Storage, and to enhance active capacity and daily throughput at the Kasymovskoye UGSF.<br />

Commissioned underground gas storage facilities in 2014<br />

In Russia:<br />

— new 9.6 MW of compressor station capacity at the Nevskoye UGSF;<br />

— 0.7 bcm of active capacity at the Severo-Stavropolskoye and Nevskoye UGSFs;<br />

— connection of 6 production wells at the Severo-Stavropolskoye UGSF.<br />

In the FSU Countries:<br />

— 0.1 bcm of active capacity and connection of three production wells at the Mozyrskoye UGSF.<br />

In Europe:<br />

— a third cavern, the 50 mmcm Katharina UGSF, was commissioned.<br />

<strong>Gazprom</strong> continued the construction of the Katharina UGSF in Germany, as well as the Damborice<br />

UGSF in the Czech Republic.<br />

The bulk of capital expenditures on FSU UGSFs was spent on the expansion of the Mozyrskoye<br />

and Priburgskoye UGSFs in Belarus, and the construction of underground tank No. 25G at<br />

the Abovyanskaya underground gas storage station in Armenia.<br />