76<br />
Performance Results<br />
Major investment projects<br />
During 2014,<br />
the Group<br />
commissioned<br />
905 MW of new<br />
generating capacity<br />
in Russia.<br />
<strong>Gazprom</strong> Group’s investment programme is one of the largest in the Russian power industry.<br />
The Group’s generating companies are implementing the investment programme, subject to their<br />
obligations under capacity supply agreements (CSA). Completion of the CSA programme by the<br />
Group’s companies is expected to provide c. 9 GW of new generating capacity in Russia in 2007<br />
through 2016.<br />
During 2014, the Group commissioned 905 MW of new generating capacity in Russia.<br />
Thus, from 2007 through 2014, the Group commissioned 6.1 GW of new capacity under CSAs.<br />
Additionally, <strong>Gazprom</strong> is decommissioning inefficient generating facilities, with 428 MW decommissioned<br />
over the reporting period.<br />
Commissioning and decommissioning by generating companies in 2014<br />
— PGU-420 power unit commissioning at CHPP-16 of OAO Mosenergo with a capacity of 420 MW.<br />
— PGU-420 power unit commissioning at Cherepovetskaya GRES of OAO OGK-2 with a capacity of 420 MW.<br />
— Gas turbine commissioning at CHPP-9 of OAO Mosenergo with a capacity of 64.8 MW.<br />
— Decommissioning of three 150 MW turbine generators and two boiler plants at Serovskaya GRES of OAO OGK-2.<br />
— Power unit decommissioning at Troitskaya GRES of OAO OGK-2 with a capacity of 278 MW.<br />
<strong>Gazprom</strong> Group’s capex for power and heat generation and distribution during 2014 was<br />
RUB 72.7bn, i.e. slightly increased y-o-y (RUB 71.5bn in 2013).<br />
The bulk of capital expenditures was allocated for the construction of steam power units at the<br />
Troitskaya GRES (660 MW) and Novocherkasskaya GRES (330 MW) of OAO OGK-2, steam power<br />
units at CHPP-12 (220 MW) and CHPP-20 (420 MW) of OAO Mosenergo, and a gas turbine for the<br />
combined heat and power plant (100 MW) at Centralnaya CHPP of OAO TGC-1.<br />
OAO <strong>Gazprom</strong> Annual Report 2014