11.07.2015 Views

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Transportation and Street Capital <strong>Project</strong>sFunding Programmed: PartialSystem Upgrades, Reconstruction, Rehabilitation, and PreservationBridge Preservation and Rehabilitation Improvement SDC Eligibility: 0%<strong>Project</strong> Description: This project will address known deficiencies to <strong>City</strong> owned bridges discovered through required semiannualODOT Bridge Inspections. These inspections have identified $50k <strong>of</strong> needed repairs to preserve function and structuralintegrity <strong>of</strong> six <strong>City</strong> bridges.Justification: There are six bridges maintained by the <strong>City</strong> that are currently inspected by ODOT in correlation to the Statewide transportation system. Repair activities include bank scour beneath the bridge, rebuilding or replacement <strong>of</strong> a concretenosing, grouting, secure embankment erosion, replacing split spacer block, replacing a wing wall and patching concretespalding. Steps need to be taken to address the financing <strong>of</strong> these projects before they reach a critical stage.<strong>Project</strong> Driver: ODOT Bridge Inspection reports that are provided on a semi-annual basis - these reports identifyrepairs and deficiencies with each bridge. PW Maintenance performs 6 month inspections to identifynew issues and monitor existing ones.<strong>Project</strong> Trigger: Due to reduction in street funding there will be little or no operating funds to absorb a bridge repairproject if necessary. Aging facilities and regulatory requirements.<strong>Project</strong> Status: MonitoringSpecific Plans/Policies Related to this <strong>Project</strong>:<strong>City</strong> Council GoalsEXPENDITURE SCHEDULE ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Planning $ -Engineering $ -Land/Right <strong>of</strong> Way $ -Construction $ 60 $ 10 $ 10 $ 10 $ 10 $ 10 $ 10Other $ -Total $ 60 $ 10 $ 10 $ 10 $ 10 $ 10 $ 10 $ -OPERATIONAL IMPACT ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Maintenance Costs $ 6 $ 1 $ 1 $ 1 $ 1 $ 1 $ 1Personnel Costs $ 30 $ 5 $ 5 $ 5 $ 5 $ 5 $ 5Total $ 36 $ 6 $ 6 $ 6 $ 6 $ 6 $ 6 $ -FUNDING SOURCE ($000s)Source Fund # Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Special Assmt. $ -AFG Grant 420 $ -SDCs. Reimb. (<strong>WW</strong>) 442 $ -Federal Aid 420 $ -State Aid 420 $ -SDCs. Imp (Storm) 440 $ -SDCs, Reimb. (Str.) 446 $ 50 $ 10$ 10 $ 10 $ 10 $ 10Unspecified $ 10$ 10Total $ 60 $ 10 $ 10 $ 10 $ 10 $ 10 $ 10 $ -Page 982012-2016 Capital Improvement Program

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!