StormwaterFunding Programmed: YesAccount # 850089System Expansion, Upgrades, Rehabilitation, and Water QualityChannel Improvement Improvement SDC Eligibility: 3.5%<strong>Project</strong> Description: This project is intended to provide improvements to key drainage ways to address barriers to fishpassage, and to correct previous channel modifications that have caused deterioration <strong>of</strong> flow capacity, water quality, andfish habitat functions. These improvements include culvert replacements or retr<strong>of</strong>its, road crossing and outfallmodifications, and channel restoration. The adoption <strong>of</strong> the <strong>Springfield</strong> Total Maximum Daily Load Implementation Planidentifies an additional temperature benefit from channel restoration and shading.Justification: This project addresses the "Take Guidance" provided by the National Marine Fisheries Service in theirissuance <strong>of</strong> the Environmental Species Act Section 4(d) rules to conserve and protect remaining Spring Chinook SalmonHabitat. This project also enables the <strong>City</strong> to meet Clean Water Act requirements by improving water quality throughchannel restoration improvements. The listing <strong>of</strong> the Willamette and McKenzie rivers for temperature identifies the needto provide riparian improvement and shading.<strong>Project</strong> Driver:<strong>Project</strong> Trigger:<strong>Project</strong> Status:Regulatory and environmental requirements.The need to meet regulatory requirements and address capacity issues.Accumulating fund for projects as developed.Specific Plans/Policies Related to this <strong>Project</strong>:<strong>Springfield</strong> Stormwater Management PlanMetro Waterways <strong>Project</strong>DEQ Stormwater Discharge PermitTotal Maximum Daily Load Implementation PlanNatural Hazard Mitigation PlanEXPENDITURE SCHEDULE ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Planning $ -Engineering $ 67 $ 7 $ 12 $ 12 $ 12 $ 12 $ 12Land/Right <strong>of</strong> Way $ -Construction $ 120 $ 20 $ 20 $ 20 $ 20 $ 20 $ 20Other $ 270 $ 30 $ 48 $ 48 $ 48 $ 48 $ 48Total $ 457 $ 57 $ 80 $ 80 $ 80 $ 80 $ 80 $ -OPERATIONAL IMPACT ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Maintenance Costs $ 8 $ 1 $ 1 $ 1 $ 1 $ 2 $ 2Personnel Costs $ 39 $ 5 $ 6 $ 6 $ 7 $ 7 $ 8Total $ 47 $ 6 $ 7 $ 7 $ 8 $ 9 $ 10 $ -FUNDING SOURCE ($000s)Source Fund # Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Special Assmt. $ -Revenue Bonds 420 $ -User Fees 425 $ 445 $ 55 $ 78 $ 78 $ 78 $ 78 $ 78Federal Aid 420 $ -State Aid 420 $ -SDCs, Imp. 440 $ 12 $ 2 $ 2 $ 2 $ 2 $ 2 $ 2SDCs. Reimb. 441 $ 100$ 20 $ 20 $ 20 $ 20 $ 20Total $ 557 $ 57 $ 100 $ 100 $ 100 $ 100 $ 100 $ -2012-2016 Capital Improvement Program Page 45

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!