StormwaterSystem Expansion, Upgrades, Rehabilitation, and Water QualityFunding Programmed: YesAccount # 830017Metro Waterways Study Improvement SDC Eligibility: 12.7%<strong>Project</strong> Description: <strong>Springfield</strong> is participating along with Eugene and Lane County in an ongoing Army Corps <strong>of</strong>Engineers General Investigation Study authorized under the Water Resources Development Act. <strong>Springfield</strong>’s share (25%)<strong>of</strong> this approximately $3,500,000 project is $875,000. The current project is a feasibility study necessary to identify futurewater quality projects within the Eugene/<strong>Springfield</strong> metropolitan watershed. CIP projects, such as Channel Improvements,Floodplain Mapping (currently underway) and McKenzie Oxbow will qualify as in-kind match and satisfy the balance <strong>of</strong> thelocal obligation. The Cedar Creek Drainage Basin has been identified as <strong>Springfield</strong>’s highest priority study area. TheCedar Creek Intake reconstruction is identified as the initial project in the Metro Waterways Study. The IntakeReconstruction is identified in a separate project sheet.Justification: This planning study will assist the <strong>City</strong> in future years to gain access to federal funding (similar to the MillRace funding) for capital improvement projects that address drainage capacity, water quality, and flood control.<strong>Project</strong> Driver: Currently stormwater from the Thurston area outfalls into Cedar Creek. Future developments willincrease stormwater and impact Cedar Creek.<strong>Project</strong> Trigger: Future growth, stormwater management and water quality.<strong>Project</strong> Status: Accumulating fund for projects as developed.Specific Plans/Policies Related to this <strong>Project</strong>:<strong>Springfield</strong> Stormwater Management PlanMetro Waterways <strong>Project</strong>DEQ Stormwater Discharge PermitTotal Maximum Daily Load Implementation PlanNatural Hazard Mitigation PlanEXPENDITURE SCHEDULE ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Planning $ 250 $ 50 $ 50 $ 50 $ 50 $ 50Engineering $ -Land/Right <strong>of</strong> Way $ -Construction $ -Other $ -Total $ 250 $ 50 $ 50 $ 50 $ 50 $ 50 $ - $ -OPERATIONAL IMPACT ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Maintenance Costs $ -Personnel Costs $ -Total $ - $ - $ - $ - $ - $ - $ - $ -FUNDING SOURCE ($000s)Source Fund # Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Special Assmt. $ -Revenue Bonds 420 $ -User Fees 425 $ 125 $ 25 $ 25 $ 25 $ 25 $ 25Federal Aid 420 $ -State Aid 420 $ -SDCs, Imp. 440 $ 125 $ 25 $ 25 $ 25 $ 25 $ 25Other $ -Total $ 250 $ 50 $ 50 $ 50 $ 50 $ 50 $ - $ -Page 442012-2016 Capital Improvement Program

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!