11.07.2015 Views

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WastewaterSystem Expansion, Upgrades, and RehabilitationFunding Programmed: PartialAccount #"A" Street Improvements Unit 3 Improvement SDC Eligibility: 40%Map ID-<strong>WW</strong>16<strong>Project</strong> Description: This project replaces approximately 325 feet <strong>of</strong> an exiting 10 inch wastewater pipe with a 12 inchpipe from 70 th Street east along "A" Street. Continued flow monitoring is recommended prior to preliminary design.Justification: This project was identified as a system need to provide capacity for future growth within the existing landuse designations in the east <strong>Springfield</strong> area.<strong>Project</strong> Driver:<strong>Project</strong> Trigger:<strong>Project</strong> Status:<strong>Springfield</strong> desires to provide services to areas within the Urban Growth Boundary (UGB) to promotefuture urban development. The Wastewater Master Plan prioritized this project for completion by 2013.Development within the east <strong>Springfield</strong> Area - capacity issues.Deferred pending funding and development activitySpecific Plans/Policies Related to this <strong>Project</strong>:2008 Wastewater Master PlanEXPENDITURE SCHEDULE ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Planning $ -Engineering $ 65$ 65Land/Right <strong>of</strong> Way $ -Construction $ 115$ 115Other $ -Total $ 180 $ - $ - $ - $ 180 $ - $ - $ -OPERATIONAL IMPACT ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Maintenance Costs $ -Personnel Costs $ -Total $ - $ - $ - $ - $ - $ - $ - $ -FUNDING SOURCE ($000s)Source Fund # Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Special Assmt. $ -Revenue Bonds 409 $ -User Fees 409 $ -Federal Aid 420 $ -State Aid 420 $ -SDCs, Imp. 443 $ 72$ 72SDCs, Reimb. 442 $ -Unspecified $ 108$ 108Total $ 180 $ - $ - $ - $ 180 $ - $ - $ -2012-2016 Capital Improvement Program Page 147

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!