11.07.2015 Views

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Buildings and PropertyConstruction and PreservationFunding Programmed: NoAccount #<strong>City</strong> Hall Storage FacilityMap ID-BP14<strong>Project</strong> Description: This project is to construct a storage facility under <strong>City</strong> Hall to provide long term file storage for <strong>City</strong>Departments. The facility is proposed to be weather-tight, split-face concrete block building with a concrete floor, it will beclimate controlled and fire protected to assure proper storage <strong>of</strong> materials and files.Justification: There is unutilized space under <strong>City</strong> Hall between the fleet vehicle parking and the public sidewalk where thisstorage facility can be constructed. Every Department has growing storage needs, particularly for long term file retention andsupplies. Limited storage space in <strong>City</strong> Hall has caused several Departments to rent storage <strong>of</strong>f-site or crowd files into workareas. This facility will reduce or eliminate the need for rental spaces and create additional useable space for staff.<strong>Project</strong> Driver:<strong>Project</strong> Trigger:Limited spaceCapacity Issues<strong>Project</strong> Status: Deferred pending fundingSpecific Plans/Policies Related to this <strong>Project</strong>:<strong>City</strong> Council Goals: Financially Responsible and Stable Governmental Services, and Maintain & Improve Infrastructure andFacilities.EXPENDITURE SCHEDULE ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Planning $ -Engineering $ 5$ 5Land/Right <strong>of</strong> Way $ -Construction $ 75$ 75Other $ -Total $ 80 $ - $ - $ 80 $ - $ - $ - $ -OPERATIONAL IMPACT ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Maintenance Costs $ -Personnel Costs $ -Total $ - $ - $ - $ - $ - $ - $ - $ -FUNDING SOURCE ($000s)Source Fund # Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Special Assmt. $ -SDCs. Reimb. (<strong>WW</strong>) 442 $ -Federal Aid 420 $ -State Aid 420 $ -SDCs. Imp (Storm) 440 $ -SDCs, Reimb. (Str.) 446 $ -Unspecified $ 80$ 80Total $ 80 $ - $ - $ 80 $ - $ - $ - $ -Page 1782012-2016 Capital Improvement Program

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!