11.07.2015 Views

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

StormwaterFunding Programmed: YesAccount #System Expansion, Upgrades, Rehabilitation, and Water QualityMill Race Stormwater Facility Improvement SDC Eligibility: 12.7%Map ID-SW5<strong>Project</strong> Description: <strong>Project</strong> is a stormwater treatment facility on land immediately north <strong>of</strong> the present Mill Pond on landrecently acquired from McKenzie Forest Products. The project will intercept and treat stormwater from theindustrial/commercial sub-basin south <strong>of</strong> Main Street from the Booth Kelly site (the new Woodstave line). The project willinclude open vegetative treatment for problematic pollutants to improve water quality in the <strong>Springfield</strong> Mill Race. It willalso provide detention for stormwater and enhance planned public amenities in this area. The project will require carefulphasing to coincide with projected Mill Race/Mill Pond work to maximize efficiencies.Justification: Stormwater in this sub-basin discharges into the Mill Race, and includes various industrial pollutants fromlog yards, industrial sites, and heavy downtown vehicle traffic, resulting in periodic violations <strong>of</strong> state water qualitystandards and presenting hazards to endangered fish species. The <strong>City</strong>'s agreement with the Corps <strong>of</strong> Engineers (ACOE)for the Mill Race includes efforts to improve stormwater quality in this waterway. Unique sites and facilities will enhancethe Mill Race renovation project, and provide educational opportunity and a community amenity while improving waterquality. It may provide some contribution to the Mill Pond renovation project by providing fill material at a low cost.<strong>Project</strong> Driver:<strong>Project</strong> Trigger:Completion <strong>of</strong> the Phase 1 <strong>of</strong> the Mill Race Restoration <strong>Project</strong> and stormwater quality requirements forwater entering the Mill Pond. The Stormwater Facilities Master Plan prioritized this project forcompletion in 2011.Completion <strong>of</strong> the Mill Race Restoration <strong>Project</strong><strong>Project</strong> Status: Planning and design 2011Specific Plans/Policies Related to this <strong>Project</strong>:2008 Stormwater Facilities Master PlanMill Race <strong>Project</strong>EXPENDITURE SCHEDULE ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Planning $ - $ -Engineering $ 650 $ 650Land/Right <strong>of</strong> Way $ -Construction $ 1,200$ 1,200Other $ -Total $ 1,850 $ 650 $ 1,200 $ - $ - $ - $ - $ -OPERATIONAL IMPACT ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Maintenance Costs $ 4$ 1 $ 1 $ 1 $ 1Personnel Costs $ 30 $ 1 $ 1 $ 7 $ 7 $ 7 $ 7Total $ 34 $ 1 $ 1 $ 8 $ 8 $ 8 $ 8 $ -FUNDING SOURCE ($000s)Source Fund # Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Special Assmt. $ -Revenue Bonds 425 $ 1,767 $ 1,767User Fees 425 $ -Federal Aid 420 $ -State Aid 420 $ -SDCs, Imp. 440 $ 235$ 83 $ 152Unspecified $ -Total $ 2,002 $ 1,767 $ 83 $ 152 $ - $ - $ - $ -Page 402012-2016 Capital Improvement Program

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!