11.07.2015 Views

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

WastewaterSystem Expansion, Upgrades, and RehabilitationFunding Programmed: NoAccount #Peacehealth/Riverbend Pump Station Improvement SDC Eligibility: 100%Map ID-<strong>WW</strong>19<strong>Project</strong> Description: This project is for the engineering and construction <strong>of</strong> a pump station in the RiverBend area. Theneed for the pump station will be driven by development within the RiverBend campus area and as defined in the SanitarySewer Study for RiverBend Subdivision.Justification: This project was identified as a system need to provide capacity for future growth within the existing landuse designations in the RiverBend area.<strong>Project</strong> Driver:<strong>Project</strong> Trigger:<strong>Springfield</strong> desires to provide services to areas within the Urban Growth Boundary (UGB) to promotefuture urban development. The Wastewater Master Plan prioritized this project for completion by 2012.<strong>Project</strong> construction will occur with development.Development within the RiverBend Area - capacity issues; and/or construction <strong>of</strong> the NE link betweenRiverBend Drive and International Way.<strong>Project</strong> Status:Deferred pending fundingSpecific Plans/Policies Related to this <strong>Project</strong>:2008 Wastewater Master PlanSanitary Sewer Study for RiverBend Subdivision (2005)EXPENDITURE SCHEDULE ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Planning $ -Engineering $ 956$ 956Land/Right <strong>of</strong> Way $ -Construction $ 2,233$ 2,233Other $ -$ -Total $ 3,189 $ - $ - $ 3,189 $ - $ - $ - $ -OPERATIONAL IMPACT ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Maintenance Costs $ 66 $ 11 $ 11 $ 11 $ 11 $ 11 $ 11Personnel Costs $ -Total $ 66 $ 11 $ 11 $ 11 $ 11 $ 11 $ 11 $ -FUNDING SOURCE ($000s)Source Fund # Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Special Assmt. $ -Revenue Bonds 409 $ -User Fees 409 $ -Federal Aid 420 $ -State Aid 420 $ -SDCs, Imp. 443 $ -SDCs, Reimb. 442 $ -Unspecified $ 3,189$ 3,189Total $ 3,189 $ - $ - $ 3,189 $ - $ - $ - $ -2012-2016 Capital Improvement Program Page 151

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!