11.07.2015 Views

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

StormwaterFunding Programmed: YesAccount # 850014System Expansion, Upgrades, Rehabilitation, and Water QualityDrainage Repair Improvement SDC Eligibility: 0%Map ID-SW8<strong>Project</strong> Description: This program involves the rehabilitation <strong>of</strong> <strong>Springfield</strong> drainage system to repair or replace olderpipe in the system and solve flooding problems and reduce street surface failures due to poor drainage. This program alsoincludes rehabilitation <strong>of</strong> catch basins and culverts to prevent flooding, and the contractual cleaning <strong>of</strong> large storm sewerpipe. <strong>Project</strong>s include: Repair West B St. storm outfall to Willamette River; Restore capacity in culverts on 69th St.,Channel 6, 72nd St. and 48th St. canals; Repair damaged gutter bars causing localized flooding at 2138 9th St., 1105 SSt., 345 22nd St., 1500 B St. and Olympic St., F St. - 9th to 10th.; Repair catch basins at various locations; Replace catchbasin at 717 71st St. with combination catch basin/curb inlet; Replace storm line segments at Centennial Blvd at 10th St.intersection, A St. at 26th St. intersection, Centennial Blvd at 12th St. to Mohawk Blvd; Install storm line catch basin fromintersection <strong>of</strong> 17th and S St. to storm system at 17th and T St.; Remove abandoned catch basin vault at 1482 T St.; Pipethe backyard drainage ditch between S. 46th - S. 47th St. and Bluebell - Aster St; Drainage repairs on Quarry Street andPark Street.Justification: The program will repair and replace pipe which has reached the end <strong>of</strong> its useful life, reducing maintenanceand operating costs <strong>of</strong> the drainage system by reestablishing stormwater efficiency. Reduced costs would be realized inoperational costs currently expensed by responding to localized flooding problems during rain events.<strong>Project</strong> Driver:<strong>Project</strong> Trigger:Citizen requests, field surveys, history <strong>of</strong> identified problem areas.Regulatory requirements, minimize risk and liability, capacity needs, opportunities to reducemaintenance costs, citizen requests, aged facilities.<strong>Project</strong> Status: Accumulating fund for projects as developed.Specific Plans/Policies Related to this <strong>Project</strong>:<strong>Springfield</strong> Stormwater Management PlanMetro Waterways <strong>Project</strong>DEQ Stormwater Discharge PermitNatural Hazard Mitigation PlanEXPENDITURE SCHEDULE ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Planning $ -Engineering $ 100 $ 10 $ 15 $ 15 $ 15 $ 15 $ 15 $ 15Land/Right <strong>of</strong> Way $ -Construction $ 1,250 $ 140 $ 185 $ 185 $ 185 $ 185 $ 185 $ 185Other $ -Total $ 1,350 $ 150 $ 200 $ 200 $ 200 $ 200 $ 200 $ 200OPERATIONAL IMPACT ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Maintenance Costs $ (13) $ (1) $ (1) $ (1) $ (2) $ (2) $ (3) $ (3)Personnel Costs $ (24) $ (3) $ (3) $ (3) $ (3) $ (4) $ (4) $ (4)Total $ (37) $ (4) $ (4) $ (4) $ (5) $ (6) $ (7) $ (7)FUNDING SOURCE ($000s)Source Fund # Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Special Assmt. $ -Revenue Bonds 420 $ -User Fees 425 $ 940 $ 150 $ 191 $ 129 $ 100 $ 161 $ 109100Federal Aid 420 $ -State Aid 420 $ -SDCs, Imp. 440 $ -SDCs. Reimb. 441 $ 410$ 9 $ 71 $ 100 $ 39 $ 91100Total $ 1,350 $ 150 $ 200 $ 200 $ 200 $ 200 $ 200 $ 2002012-2016 Capital Improvement Program Page 43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!