11.07.2015 Views

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

StormwaterSystem Expansion, Upgrades, Rehabilitation, and Water QualityFunding Programmed: PartialAccount #Jasper/Natron Drainage Improvement SDC Eligibility: 83.4%Map ID-SW18<strong>Project</strong> Description: Construction on channel improvement along the existing drainage ways to serve newdevelopment in the Jasper Natron basin. Impacts to the downstream property owners and natural drainageways located beyond the <strong>City</strong>'s Urban Growth Boundary will need to be assessed and mitigated in the finaldesign. The first year <strong>of</strong> the project will include additional studies to identify the downstream impacts and designthe project and its mitigation measures. Construction will occur in the following years. The impact on the <strong>City</strong>'soperations budget is estimated on the conceptual project but may change on final design. There is an expectedincrease in both the annual maintenance and personnel budget.Justification: Will expand the storm sewer system to service future growth.<strong>Project</strong> Driver: <strong>Springfield</strong> desires to provide services to areas within the existing Urban Growth Boundary(UGB) to promote future urban development. The Stormwater Facilities Master Planprioritized this project for completion in 2011.<strong>Project</strong> Trigger: Development within the Jasper/Natron area following completion <strong>of</strong> the Jasper Trunk Sewer(CIP Map ID <strong>WW</strong>-10). Council direction.<strong>Project</strong> Status: Deferred pending fundingSpecific Plans/Policies Related to this <strong>Project</strong>:2008 Stormwater Facilities Master PlanNatural Hazard Mitigation PlanTotal Maximum Daily Load Implementation PlanEXPENDITURE SCHEDULE ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Planning $ 250 $ 250Engineering $ 500 $ 500Land/Right <strong>of</strong> Way $ 500$ 500Construction $ 3,500$ 1,500 $ 2,000Other $ 250 $ 250Total $ 5,000 $ 1,000 $ 2,000 $ 2,000 $ - $ - $ - $ -OPERATIONAL IMPACT ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Maintenance Costs $ 145$ 29 $ 29 $ 29 $ 2929Personnel Costs $ 15$ 3 $ 3 $ 3 $ 33Total $ 160 $ - $ - $ 32 $ 32 $ 32 $ 32 $ 32FUNDING SOURCE ($000s)Source Fund Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Special Assmt. $ -Revenue Bonds 425 $ 1,000 $ 1,000User Fees 425 $ -Federal Aid 420 $ -State Aid 420 $ -SDCs, Imp. 440 $ -Unspecified $ 4,000$ 2,000 $ 2,000Total $ 5,000 $ 1,000 $ 2,000 $ 2,000 $ - $ - $ - $ -2012-2016 Capital Improvement Program Page 53

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!