11.07.2015 Views

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Buildings and PropertyConstruction and PreservationFunding Programmed: YesAccount #Booth Kelly Ro<strong>of</strong> Replacement/RepairMap ID-BP7<strong>Project</strong> Description: Complete ro<strong>of</strong> replacement or epoxy over coating <strong>of</strong> the existing metal ro<strong>of</strong> decking <strong>of</strong> the "Saw-tooth"building, commonly referred to as Building G at the Booth-Kelly Center.Justification: The existing ro<strong>of</strong> material <strong>of</strong> the "Saw-tooth" building is over 50 years old and no longer provides adequate weatherprotection for the building users or interior equipment.<strong>Project</strong> Driver:<strong>Project</strong> Trigger:<strong>Project</strong> Status:Internal and structural improvementsThe replacement or over coating <strong>of</strong> the ro<strong>of</strong> decking will significantly reduce/eliminate the ongoingmaintenance demands <strong>of</strong> the ro<strong>of</strong> for a period <strong>of</strong> approximately 20 years.ProgrammedSpecific Plans/Policies Related to this <strong>Project</strong>:This project supports the preservation <strong>of</strong> the Booth Kelly Center and is consistent with the Booth Kelly Development Plan.EXPENDITURE SCHEDULE ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Planning $ -Engineering $ -Land/Right <strong>of</strong> Way $ -Construction $ 400 $ 200$ 200Other $ -Total $ 400 $ 200 $ - $ - $ - $ - $ 200 $ -OPERATIONAL IMPACT ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Maintenance Costs $ -Personnel Costs $ -Total $ - $ - $ - $ - $ - $ - $ - $ -FUNDING SOURCE ($000s)Source Fund # Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Special Assmt. $ -AFG Grant 420 $ -SDCs. Reimb. (<strong>WW</strong>) 442 $ -Federal Aid 420 $ -State Aid 420 $ -SDCs. Imp (Storm) 440 $ -SDCs, Reimb. (Str.) 446 $ -Booth Kelly 618 $ 400 $ 200$ 200Unspecified $ -Total $ 400 $ 200 $ - $ - $ - $ - $ 200 $ -Page 1702012-2016 Capital Improvement Program

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!