11.07.2015 Views

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

StormwaterFunding Programmed: PartialAccount #System Expansion, Upgrades, Rehabilitation, and Water QualityCedar Creek Intake Reconstruction Improvement SDC Eligibility: 12.7%Map ID-SW20<strong>Project</strong> Description: The Cedar Creek drainage is the focus <strong>of</strong> a comprehensive series <strong>of</strong> stormwater systemimprovements identified in the Metro Waterways Study. Metro Waterways represents a regional partnership whichincludes state, federal, and local partners, including the US Corps <strong>of</strong> Engineers, Bureau <strong>of</strong> Land Management and OregonDept. <strong>of</strong> Fish and Wildlife, as well as local utilities and jurisdictions and the McKenzie Watershed Council. <strong>Project</strong>sidentified in the study focus on enhancing riparian areas and stream habitat for the benefit <strong>of</strong> endangered species,reducing urban pollutants, and repairing/restoring critical flood control infrastructure on the McKenzie River and CedarCreek.This project, the first <strong>of</strong> those identified in the multi-year study, is the reconstruction <strong>of</strong> the intake structure and associatedchannel improvements to the inlet <strong>of</strong> Cedar Creek from the McKenzie River. This work will provide for managing seasonalflows to both reduce the potential for serious wintertime flooding from the McKenzie River, and ensure adequatesummertime flows for fish habitat and downstream water users, including the <strong>Springfield</strong> Utility Board. <strong>Springfield</strong> hasparticipated in the Metro Waterways partnership since 2003.Justification: Improvements will ensure summertime stream flows in Cedar Creek to provide stormwater managementand habitat to endangered species, and will manage high storm flows, which presently threaten citizens’ homes.<strong>Project</strong> Driver:Metro Waterways Study, Cedar Creek Partnership and Salmon Trout Enhancement Program (STEP)project. The Stormwater Facility Master Plan identified this project as an ongoing need through 2018.<strong>Project</strong> Trigger: Implementation <strong>of</strong> the initial project developed out <strong>of</strong> the Metro Waterways Study and the STEPproject.<strong>Project</strong> Status: Deferred pending fundingSpecific Plans/Policies Related to this <strong>Project</strong>:Metro Waterways <strong>Project</strong>.2008 Stormwater Facilities Master PlanNatural Hazard Mitigation PlanTotal Maximum Daily Load Implementation PlanEXPENDITURE SCHEDULE ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Planning $ 125 $ 100 $ 25Engineering $ 75$ 75Land/Right <strong>of</strong> Way $ 100$ 100Construction $ 300$ 100 $ 100 $ 100Other $ -Total $ 600 $ 100 $ 100 $ 100 $ 100 $ 100 $ 100 $ -OPERATIONAL IMPACT ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Maintenance Costs $ -Personnel Costs $ -Total $ - $ - $ - $ - $ - $ - $ - $ -FUNDING SOURCE ($000s)Source Fund # Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Special Assmt. $ -Revenue Bonds 425 $ 500 $ 500User Fees 425 $ -Federal Aid 420 $ -State Aid 420 $ -SDCs, Imp. 440 $ -Unspecified $ 100$ 100Total $ 600 $ 500 $ - $ - $ - $ - $ 100 $ -2012-2016 Capital Improvement Program Page 55

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!