11.07.2015 Views

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Transportation and Street Capital <strong>Project</strong>sFunding Programmed: YesAccount #: 850101System Upgrades, Reconstruction, Rehabilitation, and PreservationInternational Way Paving Improvement SDC Eligibility: 0%Map ID-TP2<strong>Project</strong> Description: LTD has proposed to place a concrete bus lane down the middle <strong>of</strong> International Way including theportion from Sports Way to Gateway Street, which is currently paved with asphalt. Engineering has looked at theeconomics <strong>of</strong> leaving the non-bus lane portions <strong>of</strong> the street in asphalt with just an overlay, or re-paving the street in PCC,and determined that for the long term viability <strong>of</strong> the street it would be in the best interest <strong>of</strong> the <strong>City</strong> to pave all <strong>of</strong>International Way with PCC. This funding will be set aside to pay the <strong>City</strong>'s share <strong>of</strong> LTD's project.Justification: LTD is reconstructing International Way to accommodate the EmX bus system. It is in the <strong>City</strong>'s economicinterest to pave the remainder <strong>of</strong> International Way in PCC to avoid costly future maintenance.<strong>Project</strong> Driver:Opportunity for two agencies to cooperate for mutual benefit.<strong>Project</strong> Trigger:LTD EmX <strong>Project</strong><strong>Project</strong> Status: Committed to LTD to pay for paving. LTD has included this work in their construction plans.Specific Plans/Policies Related to this <strong>Project</strong>:Council adopted Engineering Design Standards and ProceduresEXPENDITURE SCHEDULE ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Planning $ -Engineering $ -Land/Right <strong>of</strong> Way $ -Construction $ -Other $ -Total $ - $ - $ - $ - $ - $ - $ - $ -OPERATIONAL IMPACT ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Maintenance Costs $ -Personnel Costs $ -Total $ - $ - $ - $ - $ - $ - $ - $ -FUNDING SOURCE ($000s)Source Fund # Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Special Assmt. $ -Street Fund 434 $ -Federal Aid 420 $ -State Aid 420 $ -SDCs, Imp. 447 $ -SDCs, Reimb. 446 $ 80 $ 80Unspecified $ -Total $ 80 $ 80 $ - $ - $ - $ - $ - $ -2012-2016 Capital Improvement Program Page 81

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!