11.07.2015 Views

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

StormwaterFunding Programmed: NoAccount #System Expansion, Upgrades, Rehabilitation, and Water Quality"Q" Street Channel Improvement SDC Eligibility: 12.7%Map ID-SW31<strong>Project</strong> Description: Channel repair, riparian enhancement and shading to address temperature issues in the TotalMaximum Daily Load (TMDL) and other water quality concerns. Reduce impact <strong>of</strong> nuisance species on water quality andbank stability. The Q Street Channel connects to the Alton Baker Canoe Canal near Autzen Stadium. Water qualityimprovements in the <strong>Springfield</strong> portion <strong>of</strong> the system will also support other efforts to restore fish habitat in the CanoeCanal.Justification: Improve water quality and temperature on existing drainage way.<strong>Project</strong> Driver:Stormwater quality requirements. The Stormwater Facilities Master Plan prioritized this project forcompletion in 2014.<strong>Project</strong> Trigger:<strong>Project</strong> Status:Regulatory requirements and environmental opportunities.Deferred pending fundingSpecific Plans/Policies Related to this <strong>Project</strong>:2008 Stormwater Facilities Master PlanStormwater Management PlanTotal Maximum Daily Load Implementation PlanMetro WaterwaysEXPENDITURE SCHEDULE ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Planning $ 100$ 100Engineering $ 100$ 100Land/Right <strong>of</strong> Way $ -Construction $ 300$ 100 $ 100 $ 100Other $ -Total $ 500 $ - $ 100 $ 100 $ 100 $ 100 $ 100 $ -OPERATIONAL IMPACT ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Maintenance Costs $ -Personnel Costs $ 16 $ 1 $ 3 $ 3 $ 3 $ 3 $ 3Total $ 16 $ 1 $ 3 $ 3 $ 3 $ 3 $ 3 $ -FUNDING SOURCE ($000s)Source Fund # Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Special Assmt. $ -Revenue Bonds 425 $ -User Fees 425 $ -Federal Aid 420 $ -State Aid 420 $ -SDCs, Imp. 440 $ -$ -Unspecified $ 500$ 100 $ 100 $ 100 $ 100 $ 100Total $ 500 $ - $ 100 $ 100 $ 100 $ 100 $ 100 $ -2012-2016 Capital Improvement Program Page 67

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!