11.07.2015 Views

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

StormwaterFunding Programmed: PartialAccount #System Expansion, Upgrades, Rehabilitation, and Water QualityChannel 6 Improvement SDC Eligibility: 3.5%<strong>Project</strong> Description: Improvements to the existing storm drainage pipes and channel, a proposed by-pass pipe, andconstruct a new regional detention facility. This project needs additional study and design to better meet regulatory goals.It is possible to pursue in phased increments.Justification: This project will increase capacity and help to reduce and eliminate localized flooding along the channel,which will lower annual operations costs.<strong>Project</strong> Driver: Flooding in area around channel 6, between I-105 and Hayden Bridge Road. Total Maximum DailyLoad goals for shading and channel improvement. The Stormwater Facilities Master Plan prioritizedthis project for completion in 2009.<strong>Project</strong> Trigger: Identified capacity and water quality needs identified in Stormwater Facilities Master Plan <strong>Project</strong> #4FC and #4 WQ<strong>Project</strong> Status: Deferred pending fundingSpecific Plans/Policies Related to this <strong>Project</strong>:2008 Stormwater Facilities Master PlanNatural Hazard Mitigation PlanEXPENDITURE SCHEDULE ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Planning $ 50$ 50Engineering $ 210 $ 60$ 150Land/Right <strong>of</strong> Way $ -Construction $ 1,240 $ 440$ 800Other $ -Total $ 1,500 $ 500 $ - $ - $ 1,000 $ - $ - $ -OPERATIONAL IMPACT ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Maintenance Costs $ 30 $ 5 $ 5 $ 5 $ 5 $ 5 $ 5Personnel Costs $ 14 $ 2 $ 2 $ 2 $ 2 $ 3 $ 3Total $ 44 $ 7 $ 7 $ 7 $ 7 $ 8 $ 8 $ -FUNDING SOURCE ($000s)Source Fund # Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Special Assmt. $ -Revenue Bonds 425 $ 482 $ 482User Fees 425 $ -Federal Aid 420 $ -State Aid 420 $ -SDCs, Imp. 440 $ 18 $ 18Unspecified $ 1,000$ 1,000Total $ 1,500 $ 500 $ - $ - $ 1,000 $ - $ - $ -Page 542012-2016 Capital Improvement Program

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!