11.07.2015 Views

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Transportation and StreetsFunding Programmed: NoConstruction and PreservationIntelligent Lighting Controls Improvement SDC Eligibility: 0%<strong>Project</strong> Description: An Intelligent lighting system will monitor street light performance. The light monitoring system will monitorenergy consumption, fixture output, light outages, generate work orders and, most importantly, alarm per set conditions. Thealarm feature would be used as a wire theft prevention with the idea <strong>of</strong> alerting the Police Department when a series <strong>of</strong> lights on acircuit suddenly goes dark. This would be a primary method <strong>of</strong> protecting the public infrastructure and cost <strong>of</strong> replacing stolenwire.Justification: In the past two years the <strong>City</strong> has lost approximately $150,000 in the repair and replacement <strong>of</strong> stolen conductorsfor street light systems. Also, current loss prevention has resulted in extra expense for our own repair <strong>of</strong> the systems that do getdamaged. Street light outages are currently reported by citizens and by <strong>City</strong> personnel conducting physical surveys <strong>of</strong> the existingsystem to search for outages and problems. With the implementation <strong>of</strong> this system there would be a reduction in labor expensefor monitoring the system, wire loss prevention and reduced time <strong>of</strong> light outages all improving customer service and satisfaction.Finally, the system has a dimming control feature that will allow for substantial energy savings by allowing the <strong>City</strong> to DIM lightoutput during non peak hours. The system will also include a data base <strong>of</strong> the lighting assets allowing much better management <strong>of</strong>the asset.<strong>Project</strong> Driver:<strong>Project</strong> Trigger:<strong>Project</strong> Status:Wire theft and street light managementOpportunity to reduce operational costsDeferred Pending Funding Allotment: this project is scalable and could be reduced in scope to cover onlyareas <strong>of</strong> high risk <strong>of</strong> wire theft.Specific Plans/Policies Related to this <strong>Project</strong>:EXPENDITURE SCHEDULE ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Planning $ -Engineering $ -Land/Right <strong>of</strong> Way $ -Construction $ -Other $ 500$ 100 $ 100 $ 100 $ 100 $ 100Total $ 500 $ - $ 100 $ 100 $ 100 $ 100 $ 100 $ -OPERATIONAL IMPACT ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Maintenance Costs $ -Personnel Costs $ (56)$ (3) $ (6) $ (8) $ (11) $ (14) $ (14)Total $ (56) $ - $ (3) $ (6) $ (8) $ (11) $ (14) $ (14)FUNDING SOURCE ($000s)Source Fund # Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Street Fund 434 $ -SDCs. Imp. (Str.) 447 $ -SDCs. Reimb. (Str.) 446 $ -Federal Aid 420 $ -State Aid 420 $ -Other $ -Unspecified $ 500$ 100 $ 100 $ 100 $ 100 $ 100Total $ 500 $ - $ 100 $ 100 $ 100 $ 100 $ 100 $ -2012-2016 Capital Improvement Program Page 113

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!