11.07.2015 Views

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

StormwaterFunding Programmed: NoAccount #System Expansion, Upgrades, Rehabilitation, and Water QualityI-5 N. Gateway/Sports Way Channel12.7%Map ID-SW30<strong>Project</strong> Description: Construct a combination flood control/water quality facility. Improve the open channel system andconstruct a 7 acre-foot combination treatment wetland facility on <strong>City</strong> owned property adjacent to the Gateway NaturalResource area.<strong>Project</strong> Driver:<strong>Project</strong> Trigger:Improvement SDC Eligibility:Justification: Improve localized water quality and add capacity to reduce flooding problems.Stormwater quality requirements and capacity needs related to development. The StormwaterFacilities Master Plan prioritized this project for completion in 2014.Stormwater Facilities Master Plan identified and capacity issues.<strong>Project</strong> Status: Deferred pending fundingSpecific Plans/Policies Related to this <strong>Project</strong>:2008 Stormwater Facilities Master PlanNatural Hazard Mitigation PlanTotal Maximum Daily Load Implementation PlanStormwater Management PlanEXPENDITURE SCHEDULE ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Planning $ -Engineering $ 105$ 105Land/Right <strong>of</strong> Way $ 440$ 440Construction $ -Other $ -Total $ 545 $ - $ - $ - $ 105 $ 440 $ - $ -OPERATIONAL IMPACT ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Maintenance Costs $ 4$ 2 $ 2Personnel Costs $ 10$ 5 $ 5Total $ 14 $ - $ - $ - $ - $ 7 $ 7 $ -FUNDING SOURCE ($000s)Source Fund # Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Special Assmt. $ -Revenue Bonds 425 $ -User Fees 425 $ -Federal Aid 420 $ -State Aid 420 $ -SDCs, Imp. 440 $ -Unspecified $ 545$ 105 $ 440Total $ 545 $ - $ - $ - $ 105 $ 440 $ - $ -Page 662012-2016 Capital Improvement Program

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!