11.07.2015 Views

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

WastewaterSystem Expansion, Upgrades, and RehabilitationFunding Programmed: PartialAccount #"A" Street Improvements Unit 2 Improvement SDC Eligibility: 30%Map ID-<strong>WW</strong>15<strong>Project</strong> Description: This project replaces approximately 529 feet <strong>of</strong> an exiting 10 inch wastewater pipe with a 12 inchpipe from 69 th Street east along "A" Street. Continued flow monitoring is recommended prior to preliminary design.Justification: This project was identified as a system need to provide capacity for future growth within the existing landuse designations in the east <strong>Springfield</strong> area.<strong>Project</strong> Driver:<strong>Project</strong> Trigger:<strong>Project</strong> Status:<strong>Springfield</strong> desires to provide services to areas within the Urban Growth Boundary (UGB) to promotefuture urban development. The Wastewater Master Plan prioritized this project for completion by 2013.Development within the east <strong>Springfield</strong> Area - capacity issues.Deferred pending funding and development activitySpecific Plans/Policies Related to this <strong>Project</strong>:2008 Wastewater Master PlanEXPENDITURE SCHEDULE ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Planning $ -Engineering $ 90$ 90Land/Right <strong>of</strong> Way $ -Construction $ 195$ 195Other $ -Total $ 285 $ - $ - $ - $ 285 $ - $ - $ -OPERATIONAL IMPACT ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Maintenance Costs $ -Personnel Costs $ -Total $ - $ - $ - $ - $ - $ - $ - $ -FUNDING SOURCE ($000s)Source Fund # Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Special Assmt. $ -Revenue Bonds 409 $ -User Fees 409 $ -Federal Aid 420 $ -State Aid 420 $ -SDCs, Imp. 443 $ 85$ 85SDCs, Reimb. 442 $ -Unspecified $ 200$ 200Total $ 285 $ - $ - $ - $ 285 $ - $ - $ -Page 1462012-2016 Capital Improvement Program

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!