11.07.2015 Views

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Transportation and Street Capital <strong>Project</strong>sFunding Programmed: NoAccount #: 850008System Upgrades, Reconstruction, Rehabilitation, and PreservationLocal/Residential Street Reconstruction Improvement SDC Eligibility: 0%<strong>Project</strong> Description: Within the <strong>City</strong>'s Street inventory, the condition <strong>of</strong> approximately 68 miles <strong>of</strong> local/ residential streetshas deteriorated to the point that reconstruction <strong>of</strong> the structure is the only option. Due to the reduction <strong>of</strong> availablefunding for preservation activities, this amount has been increasing at approxiamtely 6 miles per year over the last twoyear. The approximate cost to eliminate the current backlog is $5.5 million in 2010 dollars. Following is a partial list withthe highest priority reconstruction projects:F St. (306 ft., $23,000) C St. (332 ft., $28,500)3rd Pl. (583 ft., $43,500) Kelly Blvd. (361 ft., $25,500)Justification: This activity repairs and reconstructs failed Local and Residential street segments as identified within theInfrastrucure Managment System. The identified street segments have reached the limits <strong>of</strong> their useful life and annualmaintenance perservation activities are no longer effective or economical.<strong>Project</strong> Driver: <strong>Project</strong>s are identified by the Infrastructure Management System which tracks maintenance andimprovements to the <strong>City</strong>'s capital infrastructure.<strong>Project</strong> Trigger: Structural street failures<strong>Project</strong> Status: Deferred pending fundingSpecific Plans/Policies Related to this <strong>Project</strong>:Infrastructure Management System2010 Street Conditions ReportEXPENDITURE SCHEDULE ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Planning $ -Engineering $ 210$ 35 $ 35 $ 35 $ 35 $ 3535Land/Right <strong>of</strong> Way $ -Construction $ 1,590$ 265 $ 265 $ 265 $ 265 $ 265265Other $ -Total $ 1,800 $ - $ 300 $ 300 $ 300 $ 300 $ 300 $ 300OPERATIONAL IMPACT ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Maintenance Costs $ -Personnel Costs $ -Total $ - $ - $ - $ - $ - $ - $ - $ -FUNDING SOURCE ($000s)Source Fund # Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Special Assmt. $ -Street Fund 434 $ - -Federal Aid 420 $ -State Aid 420 $ -SDCs, Imp. 447 $ -SDCs, Reimb. 446 $ -Unspecified $ 1,800$ 300 $ 300 $ 300 $ 300 $ 300 $ 300Total $ 1,800 $ - $ 300 $ 300 $ 300 $ 300 $ 300 $ 3002012-2016 Capital Improvement Program Page 109

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!