11.07.2015 Views

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Transportation and Street Capital <strong>Project</strong>sFunding Programmed: NoAccount #:System Upgrades, Reconstruction, Rehabilitation, and PreservationLocal/Residential Street Improvement SDC Eligibility: 0%Scheduled Life Cycle Maintenace<strong>Project</strong> Description: A continuing street maintenance preservation effort to complete necessary annual life cycleprojects on the local and residential system. This includes routine overlay and street seal projects.Justification: This funding is set aside to complete required life cycle maintenace and repairs on the arterial andcollector street system throughout the <strong>City</strong>. <strong>Project</strong>s are identified within the Infrastrucure Managment System. Thisactivity is critical to limiting the number <strong>of</strong> street segments that require major reconstruction or overlays.<strong>Project</strong> Driver:Street structure has failed and current maintenance procedures no longer provide satisfactory results.<strong>Project</strong> Trigger:Street section has failed<strong>Project</strong> Status: Deferred pending fundingSpecific Plans/Policies Related to this <strong>Project</strong>:Infrastructure Management System2010 Street Conditions ReportEXPENDITURE SCHEDULE ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Planning $ -Engineering $ 450$ 75 $ 75 75 $ 75 $ 75 $ 75Land/Right <strong>of</strong> Way $ -Construction $ 3,150$ 525 $ 525 525 $ 525 $ 525 $ 525Other $ -Total $ 3,600 $ - $ 600 $ 600 $ 600 $ 600 $ 600 $ 600OPERATIONAL IMPACT ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Maintenance Costs $ -Personnel Costs $ -Total $ - $ - $ - $ - $ - $ - $ - $ -FUNDING SOURCE ($000s)Source Fund # Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Special Assmt. $ -Street Fund 434 $ -Federal Aid 420 $ -State Aid 420 $ -SDCs, Imp. 447 $ -SDCs, Reimb. 446 $ -Unspecified $ 3,600$ 600 $ 600 600 $ 600 $ 600 $ 600Total $ 3,600 $ - $ 600 $ 600 $ 600 $ 600 $ 600 $ 600Page 1102012-2016 Capital Improvement Program

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!