11.07.2015 Views

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Transportation and Street Capital <strong>Project</strong>sFunding Programmed: NoConstruction and PreservationCherokee Dr. Overlay Improvement SDC Eligibility: 0%<strong>Project</strong> Description:Justification:<strong>Project</strong> Driver:Rehabilitate the street pavement on Cherokee Drive, from S. 34th Place to S. 38th Street, to restorethe street pavement following the Cherokee Drive Sewer Local Improvement District (LID).The Cherokee Drive Sewer LID is complete. During construction, staff found that the existingpavement structure was about 2 inches <strong>of</strong> asphalt over about 6 inches <strong>of</strong> base. This structure issignificantly less than current standards for a local street, and the street is exhibiting significantcracking following the LID project.Citizen inquiries following LID construction which likely accelerated pavement failure<strong>Project</strong> Trigger:Pavement failures<strong>Project</strong> Status: Pending FundingSpecific Plans/Policies Related to this <strong>Project</strong>:<strong>City</strong> Council Goal to Maintain and Improve Infrastructure and FacilitiesEXPENDITURE SCHEDULE ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Planning $ -Engineering $ 1010Land/Right <strong>of</strong> Way $ -Construction $ 5050Other $ -Total $ 60 $ - $ - $ 60 $ - $ - $ - $ -OPERATIONAL IMPACT ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Maintenance Costs $ -Personnel Costs $ -Total $ - $ - $ - $ - $ - $ - $ - $ -FUNDING SOURCE ($000s)Source Fund # Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Street Fund 434 $ -SDCs. Imp. (Str.) 447 $ -SDCs. Reimb. (Str.) 446 $ -Federal Aid 420 $ -State Aid 420 $ -SDCs. Imp (Storm) 440 $ -Other $ -Unspecified $ 6060Total $ 60 $ - $ - $ 60 $ - $ - $ - $ -2012-2016 Capital Improvement Program Page 119

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!