11.07.2015 Views

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

StormwaterFunding Programmed: YesAccount # 830001System Expansion, Upgrades, Rehabilitation, and Water QualityMill Race Restoration Improvement SDC Eligibility: 12.7%Map ID-SW1<strong>Project</strong> Description: Phase I: Move inlet upstream to improve flow; rehabilitate former river channel to carry flow andconnect to existing Mill Race near current inlet; rehabilitate downstream channel. Phase II: lower elevation <strong>of</strong> inlet to GorrieCreek. Reconfigure Mill Pond to create a meandering channel with a 12-foot wide low flow channel and 15-foot wide highflow benches, similar to the upper Mill Race. The channel between the F Street Bridge and the Mill Pond inlet will benarrowed. The channel in the pond will have a higher riparian terrace alongside each bank, and seasonal wetland pondswill be created. The proposed three seasonal wetland ponds have a total surface area <strong>of</strong> three acres and connections atthe upstream and downstream ends. At each point, the inlet is designed to be at the channel invert elevation with theoutlet. A rock weir is proposed at each pond outlet to prevent head cuts into the ponds.Justification: Improve water quality on existing drainage way; provide habitat restoration; provide aesthetic environmentalamenities in downtown; support redevelopment <strong>of</strong> downtown.<strong>Project</strong> Driver:<strong>Project</strong> Trigger:Increase water quality along the Mill Race.In construction<strong>Project</strong> Status: Phase 1 in construction; Phase II, to be constructed FY 2011.Specific Plans/Policies Related to this <strong>Project</strong>:2008 Stormwater Facilities Master PlanEXPENDITURE SCHEDULE ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Planning $ -Engineering $ -Land/Right <strong>of</strong> Way $ -Construction $ 3,900 $ 3,150 750Other $ -Total $ 3,900 $ 3,150 $ 750 $ - $ - $ - $ - $ -OPERATIONAL IMPACT ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Maintenance Costs $ 30 $ 5 $ 5 $ 5 $ 5 $ 5 $ 5Personnel Costs $ 300 $ 50 $ 50 $ 50 $ 50 $ 50 $ 50Total $ 330 $ 55 $ 55 $ 55 $ 55 $ 55 $ 55 $ -FUNDING SOURCE ($000s)Source Fund # Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Special Assmt. $ -Revenue Bonds 420 $ 750 $ 750User Fees 425 $ -Federal Aid 420 $ 3,150 $ 3,150State Aid 420 $ -SDCs, Imp. 440 $ -Land Match $ -Unspecified $ -Total $ 3,900 $ 3,900 $ - $ - $ - $ - $ - $ -Page 362012-2016 Capital Improvement Program

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!