11.07.2015 Views

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

WW Project Pages.xlsx - City of Springfield

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Transportation and StreetsFunding Programmed: YesSystem Upgrades, Reconstruction, Rehabilitation, and PreservationGlenwood Connector Path Improvement SDC Eligibility: 0%Map ID-TP4<strong>Project</strong> Description: The Glenwood Connector Path (GCP) is a multi-use path bridge located along the south bank <strong>of</strong> theWillamette River between the I-5 Bridge and the Oldham property on the north side <strong>of</strong> Franklin Boulevard. The GCP will connectthe existing bike path from the south side <strong>of</strong> the Knickerbocker pedestrian/bike bridge in Eugene along the river bank to the southedge <strong>of</strong> the Oldham property in Glenwood. In the future, the GCP will also be able to connect to the planned GlenwoodRiverfront Path. This ODOT project is related to the Glenwood Connector Path Extension project, which is east <strong>of</strong> this project.Upon completion <strong>of</strong> the project by ODOT, the path will be owned and maintained by the <strong>City</strong>.Justification: The GCP is a crucial link between Eugene and <strong>Springfield</strong> for bicycles and pedestrians. The GCP provides thenecessary link between the existing Multi-use path in Eugene and the planned Riverfront Bike Path in Glenwood. The GlenwoodRiverfront Path is a planned bike route in TransPlan and the Regional Transportation Plan. Currently, the bicycle lane on thenorth side <strong>of</strong> Franklin Boulevard does not connect safely to the multi‐use path, forcing cyclists to cross Franklin Boulevardwithout a safe crossing treatment to access the path. The GCP provides for the safe and continuous connection.<strong>Project</strong> Driver:<strong>Project</strong> Trigger:A safe bicycle/pedestrian connection on the north side <strong>of</strong> Franklin Boulevard between Eugene and<strong>Springfield</strong>.ODOT agreement to build the GCP in conjunction with the I-5 Willamette River Bridge replacementproject.<strong>Project</strong> Status: The project is in the environmental permitting and preliminary design phase.Specific Plans/Policies Related to this <strong>Project</strong>:TransPlanGlenwood Refinement PlanRegional Transportation Plan Willamalane River Path PlanCouncil GoalEXPENDITURE SCHEDULE ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Planning $ -Engineering $ -Land/Right <strong>of</strong> Way $ -Construction $ 2,1002100Other $ -Total $ 2,100 $ - $ 2,100 $ - $ - $ - $ - $ -OPERATIONAL IMPACT ($000s)<strong>Project</strong> Element Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Maintenance Costs $ 10$ 2 $ 2 $ 2 $ 2 $ 2Personnel Costs $ 5$ 1 $ 1 $ 1 $ 1 $ 1Total $ 15 $ - $ - $ 3 $ 3 $ 3 $ 3 $ 3FUNDING SOURCE ($000s)Source Fund # Total Thru 2011 2012 2013 2014 2015 2016 Beyond 2016Street Fund 434 $ -SDCs. Imp. (Str.) 447 $ -SDCs. Reimb. (Str.) 446 $ -Federal Aid* $ 1,2001200State Aid* $ 900900Other 446 $ -Unspecified $ -Total $ 2,100 $ - $ 2,100 $ - $ - $ - $ - $ -* This funding has been dedicated as part <strong>of</strong> ODOT's project to replace the Willamette Bridge and will not flow through the <strong>City</strong>'sbudget.Page 842012-2016 Capital Improvement Program

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!