11.07.2015 Views

Glenbrook Sation REF (pdf 3.15MB) - Transport for NSW - NSW ...

Glenbrook Sation REF (pdf 3.15MB) - Transport for NSW - NSW ...

Glenbrook Sation REF (pdf 3.15MB) - Transport for NSW - NSW ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Review of Environmental Factors<strong>Glenbrook</strong> commuter car park and interchange upgradeInitiative Theme Description Applicable Completed Commentsalternativematerials• At least 25% offine aggregates(sand) aremanufacturedsand or alternativematerials.RecycledaggregateMaterialsand wasteUse recycledaggregate in nonstructuraluses (e.g.building base course,sub‐grade to any carparks and footpaths,backfilling to servicetrenches, kerb andgutter).Yes No Aggregaterequirements are to bespecified in the detaileddesign documentationLowerembodiedenergy bar andmeshMaterialsand wasteSource at least 60% ofbar and mesh that isproduced throughenergy reductionprocesses such asPolymer InjectionTechnology.Yes No To be specified in thedetaileddocumentationLow VOC paintsand finishesMaterialsand wasteSpecify low volatileorganic compound(VOC) paints andfinishes.Yes No To be specified in thedetaileddocumentationSegregation ofwasteMaterialsand wasteEnable wastesegregation in thedesign process byincluding space <strong>for</strong>the collection andsegregation of wastewith appropriatemarking (e.g. signage)and controls (e.g.lockable lids), locatedaway from sensitivereceptors (e.g. watercourses).Yes No Erosion and SedimentControl Plans are to beincluded with thedetailed designdocumentationMulchingMaterialsand wasteMulch all appropriatewaste vegetation (noweeds) wherejustified by volume ormake sure it is sent toYes No To be specified in thedetailed designdocumentation

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!